2-17
CABLE ROUTING DIAGRAM
D.
Face the joint connector with its
open end downward, and there
is no pinching with peripheral
parts.
E.
Pass the CDI magneto lead and
radiator breather hose between
the frame and the radiator
(right).
F.
Clamp the CDI magneto lead to
the frame at its locating tape.
G.
Bring the connector cover into
contact with the coupler.
H.
Locate the clamp ends in the ar-
rowed range.
I.
Insert the CDI unit band until it
stops at the CDI unit stay.
J.
Pass the CDI magneto lead and
radiator breather hose between
the frame and the radiator hose
so that they come within the ar-
row-indicated range. Also take
care so that the CDI magneto
lead passes on the left of the ra-
diator breather hose.
Summary of Contents for YZ125 2016
Page 4: ......
Page 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE...
Page 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA...
Page 61: ...3 18 CHASSIS...
Page 165: ......
Page 166: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER...