87
SIGNAL SYSTEM
ELEC
Float position
Specificated
resistance
UP
4
10
Ω
90
100
Ω
DOWN
1. Fuel sender
Remove the fuel sender from the fuel tank.
Disconnect the fuel sender coupler from the
wireharness.
Connect the pocket tester (
Ω
10) to the
fuel sender coupler lead.
2. Voltage
Connect the pocket tester (DC20 V) to the
fuel gauge coupler.
Tester (+) lead
Green terminal
Tester (–) lead
Black terminal
1
3
Check the fuel sender for specificated resis-
tance.
Replace the fuel sender.
OUT OF SPECIFICATION
Turn the main switch to “ON”.
Check for voltage (12 V) of the “Brown” lead
on the fuel sender lead.
OUT OF SPECIFICATION
Check the connection of the entire signal
system.
Refer to “CHECKING OF CONNECTIONS”.
Refer to “CIRCUIT DIAGRAM”.
MEETS
SPECIFICATION
4
BOTH MEET
SPECIFICATION
Tester (+) lead
Brown terminal
Tester (–) lead
Frame ground
1
2
YP806027
4. If the fuel gauge fails to operate.
Summary of Contents for YP250 5GM2-AE1 2000
Page 1: ......
Page 2: ......
Page 10: ......
Page 73: ...63 FRONT WHEEL CHAS 5 Install Speed sensor lead 1 ...
Page 77: ...67 CIRCUIT DIAGRAM ELEC CIRCUIT DIAGRAM ...
Page 104: ......