ENG
DISASSEMBLY THE ENGINE
4-6
PRIMARY PULLEY WHEEL
1. Remove:
• Fan
2. Remove:
• Nut
(primary pulley wheel)
NOTE:
When the nut is loosened (primary pulley
wheel), support the magnetic flywheel using
the engine wheel support tool
3. Remove:
• Conical spring washer
• One-way clutch
• Washer
• Fixed primary pulley wheel
• Shim
• Trapezoidal belt
4. Remove:
• Hub
• Primary pulley wheel assembly
SECONDARY PULLEY WHEEL
1. Remove:
• Nut
(secondary pulley wheel)
NOTE:
Support the secondary pulley wheel using the
pulley wheel clamp
.
2. Remove:
• Clutch drum
• Secondary pulley wheel assembly
• Crankcase cover gasket
• Centring devices
Engine wheel holding tool:
90890-01235
Pulley wheel clamp:
90890-01701
Summary of Contents for YB50
Page 1: ...2002 SERVICE MANUAL YN505RN AE1 ...
Page 7: ...GEN INFO 1 ...
Page 15: ......
Page 16: ...SPEC 2 ...
Page 27: ...INSP ADJ 3 ...
Page 49: ......
Page 50: ...ENG 4 ...
Page 91: ...CARB 5 ...
Page 102: ...CHAS 6 ...
Page 128: ......
Page 129: ...ELEC 7 ...
Page 156: ...LOC AVER 8 ...