2 - 37
SPEC
CABLE ROUTING
1
Front turn signal light lead (right)
2
Meter assembly lead
3
Auxiliary light lead
4
Front turn signal light lead (left)
5
Headlight lead
6
Sub-wire harness
È
Fasten the sub-wire harness and meter assem-
bly lead with a plastic band. Fasten the sub-wire
harness at the white tape. Face the end of the
plastic band forward.
É
Make sure that there is no slack in the meter
assembly lead between the meter assembly and
the plastic band. The rubber boot on the meter
assembly can be bent as shown.
Ê
Place the slack of the left and right front turn sig-
nal light leads between the headlight assembly
and front cowling assembly.
Summary of Contents for XT660R
Page 1: ...2004 XT660R S XT660X S 5VK1 AE1 SERVICE MANUAL ...
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 23: ......
Page 24: ...SPEC 2 ...
Page 26: ...SPEC ...
Page 79: ...CHK ADJ 3 ...
Page 144: ...CHAS 4 ...
Page 234: ......
Page 235: ...ENG 5 ...
Page 239: ...ENG ...
Page 324: ...COOL 6 ...
Page 326: ...COOL ...
Page 341: ...FI 7 ...
Page 343: ...FI ...
Page 380: ...ELEC 8 ...
Page 386: ...8 4 ELEC CHECKING SWITCH CONTINUITY ...
Page 418: ...8 36 ELEC LIGHTING SYSTEM ...
Page 448: ......
Page 449: ...TRBL SHTG 9 ...
Page 459: ......
Page 460: ......
Page 461: ......