– 5 –
E
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
1
Shift cable
1
WARNING
●
The cable joint should be screwed in more
than 8 mm (0.31 in).
●
Be sure to fit the projection on the cable
holder into the groove on the outer cable.
2
Shift cable joint
1
3
Shift cable holder
1
NOTE:
To install the shift cable, install the shift
cable holder with one bolt, adjusting the
cable so that the groove of the outer cable is
aligned with the projection of the cable
holder, and then install the remaining bolt
to the cable holder.
4
Bolt 6
×
14 mm (0.24
×
0.55 in)
2