Pre-operation checks
63
EJU41440
Hood check
Push down on the rear of the hood and make
sure that it is securely closed.
EJU40144
Post-launch checks
Perform the post-launch checks in the pre-op-
eration checklist while the watercraft is in the
water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 65 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU41810
Cooling water pilot outlet check
Make sure that water is discharged from the
port (left) cooling water pilot outlet while the
engine is running. (See page 30 for informa-
tion on the cooling water pilot outlets.)
EJU37451
Dual analog meter unit check
Make sure that the dual analog meter unit op-
erates properly. (See page 35 for information
on proper operation of the dual analog meter
unit.)
EJU41330
Engine idling speed check
Start the engine and warm it up. Use the ta-
chometer in the dual analog meter unit to
make sure that the engine idling speed is not
significantly above or below the specified
range.
Engine idling speed:
1250
±
100 r/min
UF2R51E0.book Page 63 Wednesday, June 22, 2011 1:38 PM
Summary of Contents for WaveRunner FZR 2012
Page 11: ...General and important labels 6 UF2R51E0 book Page 6 Wednesday June 22 2011 1 38 PM ...
Page 13: ...General and important labels 8 UF2R51E0 book Page 8 Wednesday June 22 2011 1 38 PM ...
Page 103: ...UF2R51E0 book Page 3 Wednesday June 22 2011 1 38 PM ...
Page 104: ...Printed in U S A August 2011 0 2 1 CR UF2R51E0 book Page 1 Wednesday June 22 2011 1 38 PM ...