– 5 –
E
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
7
Washer
13
×
6 mm (0.51
×
0.24 in)
1
NOTE:
• Route the QSTS
1
cables through the port
side in the steering console.
• Route the handlebar switch lead
2
, buzzer
lead and throttle cable through the starboard
side in the steering console.
• Position the corrugated tube for the throttle
cable as shown in the illustration so that the
tube attaches to the end of the outer throttle
cable.
8
Spring washer
1
9
Screw
6
×
65 mm (0.24
×
2.56 in)
1
10
Spacer
8
×
6
×
22 mm
(0.31
×
0.24
×
0.87 in)
1
11
Grip end
1
12
Bolt 5
×
35 mm (0.20
×
1.38 in)
1
13
Throttle cable
(with corrugated tube)
1