E
3-5
EMU01788
Run the engine under load (in gear with a
propeller installed) as follows.
1)
First 10 minutes:
Run the engine at the lowest possible
speed. A fast idle in neutral is best.
2)
Next 50 minutes:
Do not exceed half throttle (approxi-
mately 3,000 r/min). Vary engine speed
occasionally. If you have an easy-plan-
ing boat, accelerate at full throttle onto
plane, then immediately reduce the
throttle to 3,000 r/min or less.
3)
Second hour:
Accelerate at full throttle onto plane,
then reduce engine speed to three-
quarter throttle (approximately 4,000
r/min). Vary engine speed occasionally.
Run at full throttle for one minute, then
allow about 10 minutes of operation at
three-quarter throttle or less to let the
engine cool.
4)
Third through tenth hours:
Avoid operating at full throttle for more
than 5 minutes at a time. Let the engine
cool between full-throttle runs. Vary
engine speed occasionally. Avoid oper-
ating the engine at 2,000 r/min and
below for more than 1 hour at a time.
5)
After the first 10 hours:
Operate the engine normally. Use only
straight gasoline in the fuel tank. The oil
injection system provides proper lubri-
cation for normal operation.
69L-9-12-3 3/5/02 5:01 PM Page 6
Summary of Contents for VX250B
Page 1: ...VX250B OWNER S MANUAL U S A Edition LIT 18626 05 02 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 22: ...E MEMO ...
Page 66: ...E MEMO ...
Page 77: ...E 4 10 EMU00366 GREASING Yamaha marine grease Water resistant grease 000596 ...
Page 110: ...E MEMO ...
Page 111: ...E EMU00450 Chapter 6 INDEX INDEX 6 1 1 2 3 4 5 6 ...
Page 120: ......
Page 121: ......
Page 122: ...Printed in Japan March 2002 0 5 1 69L 28199 12 250CETO E Printed on recycled paper ...
Page 124: ...PLACE POSTAGE HERE ATTN WARRANTY DEPARTMENT Warranty card 2 27 02 11 47 AM Page 2 ...