Flow until operation begins
10
5. Flow until operation begins
Here we explain the flow from startup until operation begins. Proceed with the flow shown in the illustration
below, and consult the appropriate manuals as necessary for each step.
• Connect connectors and cables
Start operation
• Begin cyclic communication
• Check remote I/O and remote command input/output
• Debug the program
Controller
• No setting items
Host control device
• Register the network settings file (ESI)
• Set the communication parameters
Connection
and
cabling
Trial operation
Operation
6.1 Network structure
6.2 Cabling
6.3 Noise countermeasures
8
Parameter settings
RCX340 User’s Manual
Remote I/O Manual
RCX340 User’s Manual
Remote I/O Manual
Work steps
Refer to:
Communication
settings