5-40
1
2
3
4
5
6
7
8
9
10
ELECTRICAL
ELECTRIC STARTING SYSTEM
CHECKING THE BRUSH
1.
Measure:
• Brush length (of each brush) “1”
Out of specification
Replace.
2.
Check:
• Brush spring “2”
Fatigue/damage
Replace.
CHECKING THE STARTER RELAY
1.
Measure:
• Magnetic switch coil resistance
Connect the digital circuit tester (
) to the magnetic
switch.
Out of specification
Replace.
ASSEMBLING THE STARTER MOTOR
1.
Install:
• Starter drive lever “1”
1
1
2
Brush wear limit length:
6.0 mm (0.2362 in)
Model 88 Multimeter with tachometer:
YU-A1927
A
B
C
Holding coil resistance A–B:
0.88–1.32
Pull-in coil resistance A–C:
0.4–0.6
1
Summary of Contents for MX775
Page 2: ...7UD F8197 E0_Cover indd 2 2016 12 13 11 23 58 ...
Page 8: ...MEMO ...
Page 24: ...SPECIAL TOOLS AND TESTERS 1 12 1 2 3 4 5 6 7 8 9 10 GENERAL INFORMATION MEMO ...
Page 101: ...4 5 1 2 3 4 5 6 7 8 9 10 FUEL FUEL PUMPS sure fuel pump joint until a distinct click is heard ...
Page 172: ...7 14 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS WIRE ROUTING DIAGRAM ...
Page 174: ...7 16 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS WIRE ROUTING DIAGRAM LEFT SIDE VIEW ...
Page 176: ...7 18 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS WIRE ROUTING DIAGRAM RIGHT SIDE VIEW ...
Page 180: ...7 22 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS WIRE ROUTING DIAGRAM REAR SIDE VIEW ...
Page 183: ...7 25 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS WIRE ROUTING DIAGRAM MEMO ...
Page 186: ...MEMO ...
Page 187: ...7UD F8197 E0_Cover indd 2 2016 12 13 11 23 58 ...