–11–
CABLE ROUTING
SPEC
A To the headlight
B Make sure not to drop the headlight sub wire har-
ness beneath the projection of the duct. Check it
when installing the side cowling.
C Clamp the plastic locking tie to the cover 8. Place
the coupler at the rear side of the vehicle against the
plastic locking tie. Point the tip of the plastic locking
tie to the downward in the inner side of the vehicle.
D Route the head light and meter leads under the
frame’s lower part from the hollow section of the
cover 2.
E Pass the left and right handlebar switch leads out-
side of the air filter case air vent hose.
F Connect the couplers (4 units) at the frame side
hole. Do not catch each lead and wire harness when
the cover 8 is attached.
G From the radiator
H Pass the coolant reservoir tank hose through for-
ward the starter motor lead and speed sensor lead.
I Pass the speed sensor lead coupler and crankshaft
position sensor lead coupler over the throttle stop
cable.
J Pass the fuel tank breather hose and fuel tank drain
hose over the fuel hose and fuel return hose.
One rotation is possible for a twist of fuel tank
breather hose and fuel tank drain hose before an
engine clamp.
K To the rear brake light switch lead.
Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys
email: [email protected]