8-15
–
+
ELEC
E
IGNITION SYSTEM
Measure:
• Control unit output peak voltage
Below specification
→
Replace the
control unit.
NOTE:
Before measuring the control unit output
peak voltage, measure the pulser coil out-
put peak voltage.
Control unit output peak voltage
Black/white (B/W) –
Red/yellow (R/Y)
Black/green (B/G) –
Red/yellow (R/Y)
Black/brown (B/Br) –
Red/yellow (R/Y)
Black/orange (B/O) –
Red/yellow (R/Y)
Black/yellow (B/Y) –
Red/yellow (R/Y)
Black/blue (B/L) –
Red/yellow (R/Y)
r/min
Circuit
Loaded
Cranking
1,500
3,500
V
—
140
205
220
Test harness (2-pin)
YB-06767 / 90890-06767
R
/
Y
(B
/
W)
8250
MEASURING THE PULSER COIL
OUTPUT PEAK VOLTAGE
8
Measure:
• Pulser coil output peak voltage
Below specification
→
Replace the
pulser coil.
Pulser coil output peak voltage
White/red (W/R) – Black (B)
White/black (W/B) – Black (B)
White/yellow (W/Y) – Black (B)
White/green (W/G) – Black (B)
White/blue (W/L) – Black (B)
White/brown (W/Br) – Black (B)
r/min
Circuit
Loaded
Cranking
1,500
3,500
V
5.0
5.0
20
35
Test harness (8-pin)
YB-06779 / 90890-06779
B W/Y
W/Br
W/L
W/G
W/B W/R
8270