9-34
9
15. When coolant begins to flow out of the bolt
hole, tighten the water pump air bleed bolt to
the specified torque.
16. Remove panel E. (See page 9-9.)
17. Loosen the clamp screw, and then remove
the V-belt cooling duct.
18. Loosen the cylinder head air bleed bolt, with-
out removing it, to allow all of the air to es-
cape from the air bleed bolt hole.
19. When coolant begins to flow out of the bolt
hole, tighten the cylinder head air bleed bolt
to the specified torque.
20. Start the engine and let it idle for ten minutes.
21. Rev the engine five times.
Tightening torque:
Water pump air bleed bolt:
10 N·m (1.0 kgf·m, 7.4 lb·ft)
1. V-belt cooling duct
2. Clamp screw
1
2
1. Cylinder head air bleed bolt
Tightening torque:
Cylinder head air bleed bolt:
10 N·m (1.0 kgf·m, 7.4 lb·ft)
1
UB5K12E0.book Page 34 Thursday, April 23, 2020 2:45 PM