– 20 –
SPEC
CABLE ROUTING
K
Fast idle plunger outlet hose
L
Wire harness
È
Route the final gear case breather hose on top
of the leads.
É
Route the intake air pressure sensor lead to the
front of the breather hose (air filter case to fast
idle plunger unit) and above the engine idling
speed adjusting cable.
Ê
To engine
Ë
To air filter case
Ì
Route the fuel injector lead and coolant temper-
ature sensor lead to the outside of the frame.
Í
Pass the tail/brake light lead through the hole in
the rear fender.
Î
Fasten the tail/brake light lead with the holder,
making sure that the coupler is positioned to the
rear of the holder.
Ï
Route the throttle cable under the plastic cover.
Ð
Route the fast idle plunger outlet hose above the
plastic cover.
C
C
B
B
B-B
C-C
Ð
K
Ï
Ê
Ì
Í
Î
Ò
J
9
0
A
E
B
C
D
F
G
H
I
C
L
I
Ì
Ë
A
A
5
4
6
8
7
È
É
1
2
3
A-A
Ñ
1
B
– 19 –