3-38
E
EJU01862
Post-operation checks
Always perform the following post-opera-
tion checks after operating the watercraft.
1. Remove the watercraft from the water.
2. Wash down the hull, handlebars, and jet
unit with fresh water.
3. Remove the seat and check the engine
compartment for water. To drain excess
water, remove the stern drain plugs, and
then raise the bow of the watercraft
enough to allow water in the bilge to
drain out.
NOTE:
@
This watercraft is equipped with a jet vac-
uum bilge draining system and an electric
bilge draining system that remove water
from the engine compartment while you are
underway. However, some residual water will
remain. (See “Bilge” on page 3-10 for more
information.)
@
4. Put the watercraft in a horizontal posi-
tion.
5. Flush the cooling system to prevent it
from clogging with salt, sand, or dirt.
(See page 4-1 for flushing procedures.)
6. Drain residual water from the exhaust
system by alternately squeezing and
releasing the throttle lever for 10 to
15 seconds while the engine is running.
CAUTION:
@
Do not run the engine for more than
15 seconds on land. The engine could
overheat.
@
UF1B12.book Page 38 Monday, July 7, 2003 1:48 PM
Summary of Contents for FX140
Page 2: ......
Page 11: ...1 6 E EJU01352 Warning labels 1 2 UF1B12 book Page 6 Monday July 7 2003 1 48 PM...
Page 12: ...1 7 E 5 6 7 4 3 UF1B12 book Page 7 Monday July 7 2003 1 48 PM...
Page 13: ...1 8 E EJU01354 Other labels 9 0 8 A B UF1B12 book Page 8 Monday July 7 2003 1 48 PM...
Page 28: ...E MEMO UF1B12 book Page 23 Monday July 7 2003 1 48 PM...
Page 92: ...E MEMO UF1B12 book Page 41 Monday July 7 2003 1 48 PM...
Page 128: ...E MEMO UF1B12 book Page 9 Monday July 7 2003 1 48 PM...