Pre-operation checks
72
flood the engine compartment and cause
the watercraft to submerge.
[ECJ00363]
Securely install the stern drain plugs by tight-
ening them until they stop.
EJU41441
Hood check
Push down on the rear of the hood and make
sure that it is securely closed.
EJU40146
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 76 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU40553
Cooling water pilot outlet check
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 30 for information on the
cooling water pilot outlet.)
EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 39 for in-
1
Stern drain plug
2
O-ring
1
Stern drain plug
2
1
1
UF2T77E0.book Page 72 Monday, July 11, 2016 9:31 AM