SHAFT DRIVE
4-118
Example:
If the final gear case is marked “51”, the ring
gear bearing housing is marked “35”, the ring
gear is marked “+ 05”, and “f” is 13.00:
Therefore, the calculated ring gear shim
thickness is 0.41 mm.
Shim sizes are supplied in the following thick-
nesses.
Since the ring gear shims are only available
in 0.10 mm increments, round off the hun-
dredths digit.
In the example above, the calculated ring
gear shim thickness is 0.41 mm. The chart in-
structs you to round off the 1 to 0. Thus, you
should use a 0.40 mm ring gear shim.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
2. Install:
• Shims (as calculated)
• Final drive pinion gear
• Bearing retainer
(with the bearing retainer wrench “1”)
NOTICE
ECA14350
The bearing retainer has left-hand threads.
To tighten the bearing retainer, turn it coun-
terclockwise.
3. Install:
• Coupling gear “1”
• Coupling gear nut
(with the coupling gear/middle shaft tool “2”)
4. Stake the coupling gear nut “1” at a cutout “a”
in the final drive pinion gear.
5. Install:
• Ring gear bearing housing
(along with the ring gear, but without the
thrust washer)
Ring gear bearing thickness
13.00 mm (0.51 in)
B
=
45.51 + 3.35 - 35.45 - 13
=
0.41
Ring gear shims
Thickness (mm)
0.25 0.30 0.40 0.50
Hundredth
Rounded value
0, 1, 2
0
3, 4, 5, 6, 7
5
8, 9
10
T
R
.
.
Bearing retainer
110 Nm (11.0 m·kg, 80 ft·lb)
Bearing retainer wrench
90890-04050
Pinion bearing retainer & remov-
er
YM-04050
T
R
.
.
Coupling gear nut
110 Nm (11.0 m·kg, 80 ft·lb)
Coupling gear/middle shaft tool
90890-01229
Gear holder
YM-01229
New
Summary of Contents for FJR1300A(D)
Page 1: ...2013 SERVICE MANUAL FJR1300A D 1MC 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...SPECIAL TOOLS 1 61 ...
Page 101: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Page 104: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 106: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Page 107: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 108: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Page 110: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Page 112: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Page 116: ...COOLING SYSTEM DIAGRAMS 2 45 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Page 124: ...CABLE ROUTING 2 53 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Page 132: ...CABLE ROUTING 2 61 Rear fender top view 1 2 3 B C A B ...
Page 138: ...CABLE ROUTING 2 67 ...
Page 141: ......
Page 377: ...MIDDLE GEAR 5 76 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Page 428: ...WATER PUMP 6 15 ...
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 477: ...SIGNALING SYSTEM 8 28 ...
Page 533: ...FUEL INJECTION SYSTEM 8 84 ...
Page 551: ...CRUISE CONTROL SYSTEM 8 102 ...
Page 555: ...FUEL PUMP SYSTEM 8 106 ...
Page 563: ...ACCESSORY BOX SYSTEM 8 114 ...
Page 573: ...IMMOBILIZER SYSTEM 8 124 ...
Page 577: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Page 616: ...ELECTRICAL COMPONENTS 8 167 7 1 3 2 18 21 20 19 9 11 12 13 14 15 16 17 6 8 4 5 10 ...
Page 658: ......
Page 659: ......
Page 660: ......