CAMSHAFTS
5-18
d. Remove the screwdriver, make sure the tim-
ing chain tensioner rod releases, and then
tighten the cap bolt to the specified torque.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
7. Turn:
• Crankshaft
(several turns clockwise)
8. Check:
• “T” mark
Make sure the “T” mark “a” on the pickup ro-
tor is aligned with the crankcase mating sur-
face “b”.
• Camshaft holes
Make sure the holes “c” in the camshafts are
aligned with the arrow marks “d” on the cam-
shaft caps.
Out of alignment
→
Adjust.
Refer to the installation steps above.
9. Measure:
• Valve clearance
Out of specification
→
Adjust.
Refer to “ADJUSTING THE VALVE CLEAR-
ANCE” on page 3-5.
10.Install:
• Cylinder head cover gasket
• Cylinder head cover
TIP
• Apply Three Bond 1514C® “1” onto the mating
surfaces of the cylinder head cover and cylin-
der head cover gasket.
• Apply Yamaha bond No.1215 “2” onto the mat-
ing surfaces of the cylinder head cover gasket
and cylinder head.
• Install a new cylinder head cover gasket “3”,
and then cut the portions “a”.
• Tighten the cylinder head cover bolts in stages
and in a crisscross pattern.
T
R
.
.
Timing chain tensioner cap bolt
6 Nm (0.6 m·kg, 4.3 ft·lb)
1
b
a
T
R
.
.
Cylinder head cover bolt
10 Nm (1.0 m·kg, 7.2 ft·lb)
Yamaha bond No. 1215
90890-85505
(Three Bond No.1215®)
New
Summary of Contents for FJR 1300 AE 2014
Page 1: ...2014 SERVICE MANUAL FJR1300AE FJR1300AEE 2PD 28197 E0 ...
Page 6: ......
Page 8: ......
Page 104: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 106: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Page 107: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 108: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Page 110: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Page 112: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Page 116: ...COOLING SYSTEM DIAGRAMS 2 45 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Page 124: ...CABLE ROUTING 2 53 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Page 132: ...CABLE ROUTING 2 61 Rear fender top view 7 D E 6 D 5 C 1 2 3 4 A B 8 3 F ...
Page 138: ...CABLE ROUTING 2 67 ...
Page 141: ......
Page 300: ...SHAFT DRIVE 4 123 ...
Page 378: ...MIDDLE GEAR 5 75 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Page 414: ...BALANCERS 5 111 ...
Page 430: ...WATER PUMP 6 15 ...
Page 457: ...IGNITION SYSTEM 8 6 ...
Page 463: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 467: ...CHARGING SYSTEM 8 16 ...
Page 479: ...SIGNALING SYSTEM 8 28 ...
Page 539: ...FUEL INJECTION SYSTEM 8 88 ...
Page 557: ...CRUISE CONTROL SYSTEM 8 106 ...
Page 569: ...ACCESSORY BOX SYSTEM 8 118 ...
Page 579: ...IMMOBILIZER SYSTEM 8 128 ...
Page 583: ...ABS ANTI LOCK BRAKE SYSTEM 8 132 ...
Page 640: ...ELECTRICAL COMPONENTS 8 189 9 1 3 2 18 21 20 19 11 12 13 14 15 16 17 4 5 10 6 8 7 ...
Page 690: ......
Page 691: ......
Page 692: ......