PRE-DELIVERY INSPECTION REPORT
10-4
C. ELECTRICAL
a.
Ignition Switch Operation
b.
Left Hand Switch Operation & Pass Beam
• Horn
• Indicator
• Head Light
c.
All Bulbs - Functioning
d.
Battery
• Electrolyte Level
• Specific Gravity
• Routing of Breather Pipe
• Fuse
• Routing of Positive Wire (Red) Below Breather Pipe
e.
Starter Switch/Kill Switch
D. ROAD TEST
a.
Starting
b.
Gear Shifting Operation
c.
Clutch Operation
d.
Application of Brakes (Front and Rear)
e.
Speedo/ Odo Meter Operation
f.
Tachometer Operation
MAIN SELLING DLR'S
STAMP, SIGN & CODE
EXPLAINED BY
SIGNATURE :
NAME :
CUSTOMER’S SIGN.
SERVICE2.PMD
10/1/2005, 12:57 PM
4