E
4-28
c
C
8
Make sure the main switch (on applica-
ble models) is “OFF” before working
on the battery.
8
Reversal of the battery leads will dam-
age the rectifier.
8
Connect the RED lead first when
installing the battery and disconnect
the RED lead last when removing it.
Otherwise, the electrical system can
be damaged.
8
The electrical contacts of the battery
and cables must be clean and properly
connected, or the battery will not start
the engine.
Connect the RED lead to the POSITIVE (+)
terminal first.
Then connect the BLACK lead to the NEG-
ATIVE (-) terminal.
1
Red lead
2
Black lead
3
Battery
EMU12800
Disconnecting the Battery
Disconnect the BLACK lead from the NEG-
ATIVE (-) terminal first. Then disconnect the
RED lead from the POSITIVE (+) terminal.
UPPER LEVEL
LOWER LEVEL
901012
q
w
e
EMU04080
CHECKING BOLTS AND NUTS
1)
Check that bolts securing the cylinder
head and engine and the nut securing
the flywheel are tightened with their
specified tightening torque.
2)
Check the tightening torque of other
bolts and nuts.
6G8-9-1M-4 4/4/03 11:45 AM Page 29
Summary of Contents for F9.9C
Page 1: ...F9 9C T9 9C OWNER S MANUAL U S A Edition LIT 18626 05 49 ...
Page 2: ......
Page 22: ...E MEMO ...
Page 36: ...E MEMO ...
Page 66: ...E MEMO ...
Page 106: ...E MEMO ...
Page 107: ...EMU04500 Chapter 6 INDEX INDEX 6 1 E 1 2 3 4 5 6 ...
Page 117: ...PLACE POSTAGE HERE ATTN WARRANTY DEPARTMENT Warranty card 2 27 02 11 47 AM Page 2 ...