5-36
Ignition units and components
0
1
2
3
4
5
6
7
8
9
10
A
10. Connect the engine ECM coupler
g
, and
then install the junction box cover.
11. Connect the thermoswitch connectors.
Checking the shift cut switch
1.
Disconnect the shift cut switch coupler
a
.
2.
Turn the engine start switch to “ON,” and
then measure the input voltage.
3.
Turn the engine start switch to “OFF.”
4.
Remove the shift cut switch.
5.
Measure the shift cut switch resistance.
6.
Remove the junction box cover, and then
disconnect the engine ECM coupler
d
.
7.
Check the wiring harness for continuity.
8.
Connect the engine ECM coupler
d
, and
then install the junction box cover.
9.
Install the shift cut switch, and then con-
nect the shift cut switch coupler
a
.
Wiring harness continuity:
Pink (P)–Terminal 37
Black (B)–Terminal 8
Shift cut switch input voltage:
Blue/Yellow (L/Y)–Black (B)
4.75–5.25 V
L/Y
B
a
b
c
Shift cut switch resistance:
4.465–4.935 k
Ω
at
b
position
0
Ω
at
c
position at 20 °C (68 °F)
Wiring harness continuity:
Terminal 1–Terminal 8
Terminal 2–Terminal 9
d
8
a
d
9
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......