10
CLP-110
9.
PL Circuit Board
(Time required: about 7 min)
9-1
Remove the top board assembly. (See procedure 1)
9-2
Remove the key cover assembly. (See procedure 3)
9-3
Remove the end block assembly (L, R). (See procedure 4)
9-4
Remove the keyboard assembly. (See procedure 8)
9-5
Remove the screw marked [T2f]. The PL circuit board can then be removed. (Fig.5)
10.
Back Top Board Assembly
(Time required: about 5 min)
10-1
Remove the top board assembly. (See procedure 1)
10-2
Remove the screw marked [23] for each side. (Fig.2)
10-3
Remove the six (6) screws marked [T9a] and the two (2) screws marked [T9b] for each side. The back top
board assembly can then be removed. (Fig.9)
[T5]
[T9a]
[T9c]
[T9c]
[T9b]
Side Cover Assembly (L)
Side Cover Assembly (R)
Back Top Panel Assembly
11.
Main Unit (Time required: about 2 min)
*
For safety, this process should be done by two
personnel.
*
Previously, spread soft cloth on where the main
unit will be laid after it is removed.
*
In removing the main unit, take great care not to
catch fingers between the main unit and the stand.
11-1
Remove the two (2) screws marked [S1] for each
side. (Fig.10)
11-2
Move the main unit backward and lift it out.
(Fig.10)
(Fig.9)
[T5]:
Bind Head Tapping Screw-1 3.5X16 MFZN2Y (EP030190)
[T9]:
Truss Head Tapping Screw-1 3.5X25 MFZN2Y (EN630080)
[S1] x 4
(Fig.10)
[S1]:
Bind Head Screw 6.0X16 MFZN2BL (EG360020)