
8-41
1
2
3
4
5
6
7
8
9
10
11
3. Loosen the locknut on each side of the swing-
arm. To tighten the drive chain, turn the ad-
justing bolts in direction (a). To loosen the
drive chain, turn the adjusting bolts in direction
(b) and push the wheels forward. Turn each
adjusting bolt exactly the same amount to
maintain correct axle alignment.
TIP
There are alignment marks on each side of the
swingarm and on the wheel hubs. Use them to
check for proper wheel axle alignment.
NOTICE
ECB00541
Improper drive chain slack will overload the en-
gine as well as other vital parts of the ATV and
can lead to drive chain slippage or breakage.
To prevent this from occurring, keep the drive
chain slack within the specified limits.
4. Tighten the locknuts and the axle holding nuts
to the specified torques.
1. Axle holding nut (upper)
2. Axle holding nut (lower)
1
2
1. Locknut
2. Drive chain slack adjusting bolt
3. Alignment marks
1
2
3
Summary of Contents for BANSHEE YFZ350Y
Page 2: ...PRINTED IN JAPAN 2008 06 0 6x2 E F S YAMAHA MOTOR CO LTD ...
Page 18: ...2 4 1 2 3 4 5 6 7 8 9 10 11 ...
Page 20: ...2 6 1 2 3 4 5 6 7 8 9 10 11 ...
Page 54: ...7 1 1 2 3 4 5 6 7 8 9 10 11 EBU21141 RIDING YOUR ATV ...
Page 138: ...11 3 1 2 3 4 5 6 7 8 9 10 11 1 Model label 1 ...
Page 141: ......
Page 142: ...PRINTED IN JAPAN 2008 06 0 6x2 E YAMAHA MOTOR CO LTD PRINTED ON RECYCLED PAPER ...