O
peratiOn
3
3-10
Lights
Check for proper operation of the bow,
stern, and instrument lights by press-
ing the switch
on the control panel.
If the stern light is not installed, remove
it from the storage area, lift the socket
cover, and install it into the socket to
check operation.
Horn
Press the horn switch
to be sure the
horn operates.
Engine Shut-Off Switch
Engine shut-off switch
Clip with cord
First, place the boat in the water to
provide adequate engine cooling.
Start the engine, and then remove the
engine shut-off switch clip, and verify
that the engine stops.
Refer to pages 3-16 to 3-18, “START-
ING THE ENGINES,” for information on
proper operation of the starter switch.
HORN
NAV
ANCH
SHOWER
TOWER
LTS
CTLT/
TOWER
DOCKING
LTD
242 LIMITED S MODEL SHOWN
HORN
NAV
ANCH
SHOWER
TOWER
LTS
CTLT/
TOWER
DOCKING
LTD
242 LIMITED S MODEL SHOWN
Summary of Contents for 242 Limited S
Page 4: ......
Page 6: ......
Page 8: ......
Page 28: ......
Page 30: ......
Page 32: ...Features Functions 2 2 2 ...
Page 58: ......
Page 60: ......
Page 94: ......
Page 116: ......
Page 124: ......
Page 134: ......
Page 135: ...LIT 18626 09 38 2011 YAMAHA MOTOR CORPORATION U S A Printed in U S A ...