3
3. Preparations before Operation
1) First loosen the pan-head screw and take out the pump from the cabinet.
Remove the rubber cap at the bottom of the pump assembly, insert the
pump into the cabinet, and fix it with a pan-head screw.
<Assembly of Equipment> indicated on the top surface of the corrugated
fiberboard case. (Fig. 1)
2) Loosen the two clamping nuts at the bottom of the cabinet (turn them
counterclockwise), and remove the cabinet from the base frame. (Fig. 2)
3) Place a pail in the middle of the base frame and install the cabinet as it
was. Tighten the clamping nuts on both sides equally.
4) Connect the attached high-pressure hose and grease gun to the discharge
port of the pump.
5) When the air coupler is connected to the pump, the pump and hose will be
filled with grease. After that, the pump operation will stop.
6) The first applied grease includes the internal air of the pump. This is not a
good condition. Obtain a perfect condition by the next operation.
First open the check valve and operate the pump until grease is
discharged from a small hole under the check valve. (Fig. 3)
At this time, spread paper so that grease may not come into touch with the
hand, and dispose of the discharged grease.
<
NOTE
>
・
The grease in which air is mixed is cloudy in white.
Fig. 1
Fig. 3
Fig. 2