![YAMADA SH-125B Series Instruction Download Page 6](http://html1.mh-extra.com/html/yamada/sh-125b-series/sh-125b-series_instruction_3190823006.webp)
Table of Contents
- Preface
-
For Safe Operation
- Warnings and Cautions
- Precautions on Use
- Table of Contents
1.
Part Names
1.1 Part names
······························································································ 1
1.2 Contents of a package ···························································································· 1
2. Operating principle ····················································································
1
3. Preparation of Installation and Operation ························································
2
3.1 Pump installation ··································································································· 3
3.2 Installation of drum pump(Using a drum cover) ···························································· 3
3.3 Installation of drum pump(Using a bung adapter)
··················································
3
3.4 Installation of siphon pump ······················································································ 4
3.5 Installation of silencer ····························································································· 4
3.6 Connecting the ground wire ····················································································· 4
3.7 Discharge piping ··································································································· 5
3.8 Air piping ············································································································· 5
3.9 Preparation for use ································································································ 5
4. Operating Method ······················································································
6
4.1 Operation switch and valve ······················································································ 7
4.2 Solvent cup ·········································································································· 7
4.3 Filling delivery piping with material ············································································ 8
4.4 Operation ············································································································ 8
4.5 Retightening gland packing ····················································································· 8
4.6 When container is empty (changing drum) ·································································· 8
4.7 After work ············································································································ 8
5. Maintenance and Inspection ········································································
9
5.1 Maintenance and Inspection ···················································································· 10
5.2 Troubleshooting ···································································································· 11
5.3 Consumable
·····························································································
12
5.4 Design standard use period
···········································································
13
6. Parts Disassembly Drawing and Parts List ······················································
13
7. Specifications ···························································································
19
8. Limited Warranty ·······················································································
22
Summary of Contents for SH-125B Series
Page 29: ......