1
Fig.2.1 Fig.2.2
1. Principles of operation
There are two diaphragms fixed to the center rod, one at each end. When compressed air is supplied to air
chamber b (right side, see Fig.1.1), the center rod moves to the right, the material in material chamber B is
pushed out, and at the same time material is sucked into material chamber A.
When the center rod is moved full-stroke to the right, the air switch valve is switched, compressed air is sent to
air chamber a (left side, see Fig.1.2), and the center rod moves to the left. The material in material chamber A is
pushed out, and at the same time material is sucked into material chamber B.
Through repetition of this operation, material is repeatedly taken in and discharged out.
2. Tools, etc.
2.1 General tools
・
Socket wrenches
10 mm, 13 mm, 17 mm
・
Open-end wrenches
13 mm, 17 mm
・
Hexagonal wrench
・
Snap ring pliers
・
Flat head screwdriver
2.2 Special tools
(
sold separately
)
・
Pilot valve remover
・
Sleeve remover
For pilot valve, cap and valve seat
For sleeve
Part No. 712606
Part No. 713148
2.3 Others
・
Assembly lubricant (oil)
Fomblin® Y25 or equivalent
・
Assembly lubricant (grease) Fomblin® GR AR555 or equivalent
Summary of Contents for DP-20F/P
Page 15: ......