CUTTER DRIVE SYSTEM
53
SRM-2620ES, SRM-2620TES
T262XS, C262S
T262TXS, C262TS
7-2 Replacing gears and PTO shaft
NOTE
: Replace drive gear (A), driven gear (B)
and ball bearings (C) as a set.
1. Remove retaining ring (D) using needle nose
pliers. Then the gear and ball bearings can be sa-
parated.
For SRM-2620TES, T262TS and C262TXS, re-
move retaining ring (E) using needle nose pliers.
2. Lubricate inside of new ball bearings with small
amount of lithium based grease, and then install
them on new drive gear using oil seal tool 897714-
24330 (F). Reinstall retaining ring (D).
Inner diameter (d
1
) :
12 mm
3. Remove ball bearing (G) from PTO shaft using
bearing wedge 897701-06030 (H) or two screw-
drivers, and remove driven gear (J) from PTO
shaft.
4. If PTO shaft or ball bearing (K) is damaged,
push out PTO shaft to remove bearing.
K
G
H
J
d
1
F
B
A
C
C
D
E
SRM-2620TES
T262TS
C262TXS
SRM-2620TES
T262TS
C262TXS
SRM-2620TES
T262TS
C262TXS