NB. Detailed installation instructions can be found in the Toro installation manual. In this product manual
only the necessary preparations and general information are mentioned.
This document describes what the Toro is, how it works, and what preparations should be made in order
to make sure that the placement and connections go flawlessly. If you still have any questions after
reading this document, you can always contact Yalp for more information.
Installing Toro
Toro has 4 interactive components (1 master goal and 3 basic goals) which are connected with cables.
These cables lie beneath the playing field (artificial grass, rubber or concrete tiles) and it’s
important that these cables will be installed properly and connected the right way.
The data+power cables (bleu) will be provided by Yalp, the costumer takes care of the 230v power cable.
The boarding is anchored to the ground with concrete anchors or bolted on the play field. For the
boarding with anchors it’s necessary to drill holes with a diameter of 30cm and at least 60cm deep. After
installing the boarding, these holes can be filled with concrete mix.