inspection of the top hook and load hook

The  top  and  load  hooks  must  be  checked 
for cracks, deformations, damage, wear and 
corrosion marks. The safety latch must move 
freely and be fully functioning.

inspection of chain reeving  
in the bottom block

All units with two or more chain falls must be 
inspected  before  initial  operation  to  ensure 
that the load chain is not twisted or kinked. 
The chains of hoists with two or more falls may 
become twisted if the bottom block is rolled 
over, for example (Fig. 11).
When replacing the chain, make sure that the 
chain is reeved correctly (Fig. 13). The chain 
weld must face outwards.
Only fit load chains which have been approved 
by the manufacturer. Non-compliance with this 
specification will render the legal warranty or 
guarantee void with immediate effect.

FUNCtiON / OPeRAtiON
Releasing the chain

Turn pawl rod lever (Fig. 12) to neutral (central) 
position.  The  chain  can  now  be  pulled  in 
both directions and the load chain fall will be 
quickly tensioned.

ATTEnTion:

 The minimum load to engage 

the  automatic  brake  lies  between  30  and 
45 kg.

Lifting the load

Turn pawl rod lever to the lifting position ‚ ‘ 
and lock it (Fig. 12).
Operate hand lever with a pumping action. If 
work is stopped while the hoist is under load, 
the pawl rod lever must remain in the lifting 
position ‚ ‘.

Lowering the load

Turn pawl rod lever to the lowering position ‚ ‘
and lock it (Fig. 12).
Operate hand lever with a pumping action.

Brake jamming

lf  a  hoist,  which  is  under  load,  is  suddenly 
relieved of load pressure, e.g. by lifting off the 
load or when pulling down walls, and lower-
ing has not been initiated first, the brake will 
remain locked. The brake will also lock if the 
load hook with the bottom block is pulled too 
tightly against the housing.

Releasing the jammed brake

Turn pawl rod lever to the lowering position , ’
and operate hand lever with a vigorous stroke. 
lf the brake is jammed on extremely tight, it 
can be released by striking the hand lever.

iNsPeCtiON, mAiNteNANCe AND 
RePAiR

According to national and international acci-
dent prevention and safety regulations hoisting 
equipment must be inspected:
• in accordance with the risk assessment of 

the operating company

• prior to initial operation
• before  the  unit  is  put  into  service  again 

following a shut down

• after substantial changes
• however, at least once per year, by a 

competent person.

ATTEnTion:

 Actual operating conditions (e.g. 

operation in galvanizing facilities) can dictate 
shorter inspection intervals.

Repair work may only be carried out by a spe-
cialist workshop that uses original Yale spare 
parts. The inspection (mainly consisting of a 
visual inspection and a function check) must 
determine that all safety devices are complete 
and fully operational and cover the condition 
of the unit, suspension, equipment and sup-
porting structure with regard to damage, wear, 
corrosion or any other alterations.
Initial  operation  and  recurring  inspections 
must be documented (e.g. in the CMCO works 
certificate of compliance).
If required, the results of inspections and ap-
propriate repairs must be verified. If the hoist 
(from 1 t lifting weight) is fitted on or in a trolley 
and if the hoist is used to move a lifted load 
in one or several directions, the installation 
is considered to be a crane and the further 
inspections must be carried out, as required.
Paint damage should be touched up in order to 
avoid corrosion. All joints and sliding surfaces 
should be slightly greased. In the case of heavy 
contamination, the unit must be cleaned.
The  unit  must  be  given  a  general  overhaul 
after 10 years, at the latest.
In  particular,  check  the  dimensions  of  the 
load chain, the load hook and the top hook. 
They must be compared with the dimensions 
specified in the table (Tab. 2, Tab. 3).

ATTEnTion:

  After  the  replacement  of 

components,  a  subsequent  inspection  by  a 
competent person is obligatory!

inspection of the load chain 

(acc. to DIN 685-5)
Load chains must be inspected for mechanical 
damage  at  annular  intervals,  however  after 
50 operating hours, at the latest. Inspect the 
load chain for sufficient lubrication and check 
for external defects, deformations, superficial 
cracks, wear and corrosion marks.
Round steel section chains must be replaced 
when the original nominal thickness ´d´ on 

the chain link with the worst wear has been 
reduced by more than 10% or when the chain 
has  elongated  over  one  pitch ´p

n

´ by  5 % 

(Fig. 14) or over 11 pitches (11 x p

n

) by 3 %.

Nominal  dimensions  and  wear  limits  are 
shown in table 2. If one of the limit values is 
reached, the load chain must be replaced.

maintenance of the load chain

In most cases, chain wear in the link points 
is caused by insufficient care of the chain. In 
order to ensure optimal lubrication of the link 
contact points, lubricate the chain at regular 
intervals adapted to the application with creep-
type lubricant (e.g. gear oil).
A dry film lubricant, e.g. PTFE spray, should 
be used in environments where abrasives like 
sand, etc., occur.
The service life of the load chain can be in-
creased by careful lubrication to 20 - 30 times 
compared with a chain that is not serviced.
-  When lubricating the chain, make sure the 

chain is in no-load condition so that the oil 
can reach the contact points of the chain 
links which are subject to wear. Chain link 
parts contacting each other must always be 
coated with lubricant, otherwise increased 
wear on the chain results.

-  It is not sufficient to lubricate the chains on 

the outside as this does not ensure that a 
lubricant  film  can  build  up  in  the  contact 
points.

-  With a constant lifting path of the chain, the 

change-over  area  from  lifting  to  lowering 
movement must be checked in particular.

-  Make sure that the load chain is lubricated 

over its entire length, also including the part 
of the chain in the housing of the hoist.

-  Clean dirty chains with petroleum or a similar 

cleaning agent, never heat the chain.

-  When lubricating the chain, also check the 

chain for wear.

ATTEnTion:

 It must be ensured that no lub-

ricant can penetrate into the brake enclosure. 
This may result in failure of the brake.

Replacing the load chain

The load chain must be replaced by a new 
chain of the same dimensions and quality in 
the event of visible damage or deformations, 
however, when the discarding status has been 
reached, at the latest.
A  load  chain  to  be  discarded  must  only  be 
replaced by an authorized specialist workshop.
Only fit load chains which have been approved 
by the manufacturer. Non-compliance with this 
specification will render the legal warranty or 
guarantee void with immediate effect.

note:

 Replacement of a load chain must be 

documented!

Summary of Contents for UNOplus

Page 1: ...600 0 Fax 49 0 2051 600 127 Ident No 09901114 10 2012 Allzweckger t Ratchet lever hoist Palan levier rochet UNOplus WLL 750 6 000kg Original Betriebsanleitung Gilt auch f r Sonderausf hrungen Translat...

Page 2: ...achten dass das Hebezeug so bedient werden kann dass der Bediener weder durch das Ger t selbst noch durch das Tragmittel oder die Last gef hrdet wird Der Bediener darf eine Lastbewegung erst dann einl...

Page 3: ...her aufgenommen werden k nnen Es ist daf r zu sorgen dass sich das Ger t auch unter Last frei ausrichten kann da sonst unzul ssige Zusatzbelastungen auf treten k nnen Die Auswahl und Bemessung der gee...

Page 4: ...sich in den Umlenkstellen ein Schmier film aufbaut Bei konstantem Hubweg der Kette muss auf den Umschaltbereich von Hub in Senkbewe gung besonders geachtet werden Es ist darauf zu achten dass die Las...

Page 5: ...lagert werden Hierzu den Umschalthebel auf Heben stellen und mit dem Handhebel bei gleichzeitigem Festhalten des Laststranges pumpen Soll das Ger t nach der Au erbetriebnahme wieder zum Einsatz kommen...

Page 6: ...or similar Do not repair load chains installed in the hoist Fig 8 Removing the safety latches from top and or load hooks is forbidden Fig 9 Never attach the load to the tip of the hook Fig 10 The lift...

Page 7: ...in one or several directions the installation is considered to be a crane and the further inspections must be carried out as required Paint damage should be touched up in order to avoid corrosion All...

Page 8: ...e cracks wear and signs of corrosion as required but at least once a year Actual operating conditions may also dictate shorter inspection intervals Hooks that do not fulfil all requirements must be re...

Page 9: ...s tre laiss sans surveillance ou rester lev e ou fix e pour une longue p riode Le palan peut tre utilis dans une temp ra ture ambiante entre 10 C et 50 C Consulter le fabricant dans le cas de condi ti...

Page 10: ...brins peuvent devenir torurn es si le bloc de fond est par exemple renvers Fig 11 Lors du remplacement de la cha ne assurez vous que la cha ne est plac e correctement Fig 13 Les soudures de maillons...

Page 11: ...e est endom mag ou d form e mais aussi au plus tard la fin du temps de vie Une cha ne de charge doit toujours tre remplac e par un sp cialiste autoris Utiliser seulement des cha nes qui ont t approuv...

Page 12: ...Fig 11 Fig 10 Fig 1 S Fig 6 Fig 3 Fig 4 Fig 5 Fig 7 Fig 8 Fig 2 Bestimmungsgem e Verwendung Correct operation Utilisation correcte DE EN FR Sachwidrige Verwendung Incorrect operation Utilisations inco...

Page 13: ...5 6 Fig 12 7 9 Description 1 Top hook with safety latch 2 Housing 3 Load chain 4 Bottom block 5 Load hook with safety latch 6 Handwheel 7 Pawl rod lever 8 Hand lever 9 Chain stop Description 1 Crochet...

Page 14: ...h a Fig 14 Fig 13 Kettenverlauf Chain reeving D roulement de la cha ne DE EN pn 11 x pn d1 d 2 d Nenndicke der Kette Nominal thickness of chain d1 d2 Istwert Actual value d1 d2 dm 0 9 d 2 d 1500kg 300...

Page 15: ...6000 Handkraft SHF Hand force SHF Effort min SHF appliquer manuellement sur le levier daN 20 0 35 0 40 0 40 0 Tab 1 Nominalwerte und Verschlei grenzen Nominal values and wear limitation UNOplus 750 15...

Page 16: ...m chtigter COLUMBUS McKINNON Industrial Products GmbH Am Lindenkamp 31 42549 Velbert Germany Datum Hersteller Unterschrift 24 10 2012 Dipl Ing Andreas Oelmann Angaben zum Unterzeichner Leiter Qualit t...

Page 17: ...si elle n est pas v rifi e r guli rement Produit Palan manuel cha ne Type d appareil Palan levier rochet mod UNOplus Capacit 750 6 000kg UNOplus 750 UNOplus 1500 UNOplus 3000 UNOplus 6000 N de s rie...

Page 18: ...il sales cmcosa co za Yale Engineering Products Pty Ltd 12 Laser Park Square 34 Zeiss Rd Laser Park Industrial Area Honeydew Phone 00 27 0 11 794 29 10 Web Site www yalejhb co za E mail info yalejhb c...

Reviews: