background image

09-13-592-Rev2

2/4

INSTALLATION

INSERT SPRING NUTS
- PLATFORM

Insert 4x M8 Spring Nuts 
into Platform sides and 
slats via the cut outs as 
shown.  Determine the 
best slat spacing for the 
High Lift Jack Brackets 
based on the length of 
Jack you will be carrying. 

The Spring Nuts 
do not need to be 
rotated into place.

1

POSITION SPRING NUTS IN CHANNELS

Slide Spring Nuts along channels so they are positioned as close to the 
Platform edge/end of crossbars as possible.  The Brackets can be used 
as a guide for spacing.  Ensure nuts are equally spaced as shown.  The 
Allen Key can be used to assist nut movement within channel.

2

INSERT SPRING NUTS
- LockNLoad BAR

Insert 4x M8 Spring Nuts into 
crossbar channels as shown.  

Push Spring Nuts down into crossbar 
channels and twist to lock into place.

Reviews: