28-13-335-Rev1
2/4
INSTALLATION
INSERT MOUNTING HARDWARE
- PLATFORM
Insert 2 x M6 Slot Nuts into the Platform
channel where you want to mount your
shovel or similar tool. Refer to Step
2
for positioning information.
1a
INSERT MOUNTING HARDWARE
- LOCKN’LOAD BAR
Insert 2 x M6 Spring Nuts into the crossbar
channel where you want to mount your shovel
or similar tool. Push Spring Nuts down into
crossbar channel and twist to lock into place
as pictured. Refer to Step 2 for positioning
information.
1b
x2
x2
NOTE -
Shovel Holder can be fitted to all
four sides of the LOCKN’LOAD Platform.
SELECT CORRECT MOUNTING HARDWARE
Select the correct mounting hardware
option as shown.
LOCKN’LOAD Platform and Whispbar
S-Wing (including international T-slot
crossbars) use M6 Slot Nuts.
LOCKN’LOAD Bars (including Whispbar
HD, Tradesman and other heavy duty
crossbars) use M6 Spring Nuts.
=
1
POSITION NUTS IN CHANNEL
Determine the best spacing for the Shovel Holder assemblies based on the tool you will be
carrying. For crossbars, it is recommended to position Nuts close to the end of crossbars and
ensure they are equally spaced as shown. The Allen Key can be used to assist Nut movement
within the channel.
2
=