
1032606B - 2/4
Attach end caps before
attaching tracks to roof.
Place track on roof.
Be sure to align
track holes to
holes in base
and in roof.
Install bolts and small black nylon washers into track and into roof.
NOTE: Do not
use these
washers on
bolts at each
end of tracks.
SECOND TRACK INSTALLATION:
If you have not installed the second track,
repeat the entire instruction beginning at step 1.
From inside your
shell, attach the
cap nut.
Load limits are determined by
shell roof strength. Contact your
shell manufacturer for details.
Some deflection may occur with
any significant load.
Serious off-highway driving
may also cause deflection.
Tighten the
bolts through
the track from
above.
A helpful
friend will
make this
easier.
Apply a generous
amount of silicone
sealant into the
drilled holes.
WARNING: Direct contact of uncured sealant irritates eyes
and may irritate skin. Overexposure to vapor may irritate
eyes, nose and throat. Avoid eye and skin contact. Use with
adequate ventilation. Do not handle contact lenses with
sealant on hands. In case of eye contact, flush with water for
15 minutes. Obtain medical attention. In case of skin contact,
remove from skin and flush with water. Sealant releases
acetic acid (vinegar-like odor) during cure.
Place large, white
nylon washer onto
holes to which
silicone has been
applied.
Note: Washer should be
flat against drilled hole.
Slide nut plates from your
tower kit into track
(2 per tower/4 per track).
TECHNICAL ASSISTANCE
OR REPLACEMENT PARTS
Contact your dealer or call
(888)925-4621
Monday through Friday,
7:00 AM to 5:00 PM, PST
This product is covered by YAKIMA’s
“Love It Till You Leave It” Limited
Lifetime Warranty
To obtain a copy of this warranty, go online to www.yakima.com
or email us at [email protected] or call (888) 925-4621