What this Guide Covers
This guide covers installation of the Xyplex Network 9000 Chassis, power supplies, fan
modules, and the available product modules and cabling options.
This guide is organized as follows:
Preface
Chapter 1
- Introducing the Network 9000 Multimedia Intelligent Hub
Chapter 2
- Installing the Network 9000 Chassis
Chapter 3
- Power Supply, Fans, and AC Input Modules
Chapter 4
- Installing and Removing Processor and I/O Modules
Appendix A
- Specifications
Appendix C
- Slot Ethernet Addresses
Glossary
Chapter 1: Introducing the Network 9000 Intra-Networking Hub, summarizes the features of
the Network 9000 Hub, and briefly describes how you can use the Hub and functional options to
build a network.
Chapter 2: Installing the Network 9000 Chassis, describes the hardware installation
procedures. These procedures include:
Site Preparation
Unpacking and Inspection
Mounting
Connecting AC Power
Chapter 3: Power Supply, Fans, and AC Input Modules, describes the power supply redundancy
features and how to install or remove power supply, fan trays, and ac input modules. This
chapter also describes controls and indicators of these items, and the steps to take if you
encounter a hardware problem.
Chapter 4: Installing and Removing Processor and I/O Modules, describes the general
procedure and considerations for installing and removing/replacing all function card and
I/O card options.
Appendix A, Specifications, lists the specifications of the chassis, power supplies, etc.
Appendix B, Slot Ethernet Addresses, shows you how to calculate the Ethernet address for each
device that is installed in a Network 9000 chassis.
The Glossary defines some commonly used terms in Network 9000 documentation, including
this manual.
6