Installing the Network 9000 Chassis
d . Make sure that the installation is at an optimum height from the floor to allow easy
inspection of the LED indicators and decrease the possibility of dust from the floor from
entering the unit.
Table 2-1. Chassis Site Requirements
Item
Three-Slot
Chassis
Six-Slot Chassis
Fifteen Slot Chassis
Height:
Depth:
Standalone Width:
Rackmount Width:
3.45 in (8.8 cm)
14.1 in (35.9 cm)
17.6 in (44.6 cm)
19.0 in (48.3 cm)
6.9 in (17.6 cm)
14.1 in (35.9 cm)
17.6 in (44.6 cm)
19.0 in (48.3 cm)
17.4 in (44.6 cm)
14.1 in (35.9 cm)
17.6 in (44.6 cm)
19.0 in (48.3 cm)
Weight (Chassis with
fans and one AC input
module)
7.5 lbs (344 kg)
15.0 lbs (6.8 kg)
35.0 lbs (15.9 kg)
Power Requirements
(per model)
110-240~ 2.5-1.25A
110-240~ 5-2.5A
110-240~ 12-6A
(all)
47-63 Hz, 420W peak, 1245 BTU
Environment (all)
32 to 113 degrees F (0 to 45 degrees C)
5 to 90% humidity, noncondensing
2.4
Unpacking and Inspecting the Hardware Kit
The hardware is delivered in 2 or more packages. The Hub chassis, power cable, mounting
hardware and documentation are contained in one box. Power supply, processor, and I/O
modules, and cables and associated connectors are normally shipped in separate boxes.
Perform the following steps to unpack and inspect the hardware kit:
a . Carefully unpack the hub.
b. Inspect the kit and check that all parts listed in the shipping order were received. The
cards are supplied separately. To prevent damage from static electricity, leave the cards
in their static protective bags until you are ready to install them. The hub is shipped to you
with the basic items listed in Table 2-2.
20
0023