
7
Installation
1.
The top of the upper clamp should align with the yellow bulkhead of the sonde (where the blue meets the yellow).
Proper alignment is necessary so that the PAR sensor arms are deployed at the correct angle
NOTICE
:
Proper alignment of clamps is necessary to prevent damage.
2.
The bottom of the lower clamp should align with the upper edge of the top chamfer on the clear plastic section
covered with the black “EXO²” sonde label. Again proper alignment is necessary so the PAR sensor arms are
deployed so that the PAR sensor faces axis is parallel to the sonde axis.
NOTICE
:
Proper alignment of clamps is necessary to prevent damage.
Figure 5
Align the upper clamps with the yellow bulkhead of the sonde
Figure 6
The lower clamp should align with the upper edge of the top chamfer on the clear plastic section