Installation

1. 

The top of the upper clamp should align with the yellow bulkhead of the sonde (where the blue meets the yellow).  
Proper alignment is necessary so that the PAR sensor arms are deployed at the correct angle  

 NOTICE

Proper alignment of clamps is necessary to prevent damage. 

2. 

The bottom of the lower clamp should align with the upper edge of the top chamfer on the clear plastic section 
covered with the black “EXO²” sonde label.  Again proper alignment is necessary so the PAR sensor arms are 
deployed so that the PAR sensor faces axis is parallel to the sonde axis.   

 NOTICE

Proper alignment of clamps is necessary to prevent damage. 

Figure 5

  Align the upper clamps with the yellow bulkhead of the sonde

Figure 6

 The lower clamp should align with the upper edge of the top chamfer on the clear plastic section

Summary of Contents for YSI EXO PAR

Page 1: ...USER MANUAL XA00014 EXO PAR PHOTOSYNTHETICALLY ACTIVE RADIATION WITH THE EXO PLATFORM...

Page 2: ...equipment Do not use or install this equipment in any manner other than that specified in this manual The manufacturer is not responsible for any damages due to misapplication or misuse of this produc...

Page 3: ...o certain sections will take you automatically to those locations THIS IS AN INTERACTIVE DOCUMENT TABLE OF CONTENTS 1 Introduction 1 1 PAR Sensor 1 2 Overview 1 3 Components 2 Installation 2 1 Attach...

Page 4: ...er be supplied to YSI by the customer brass mounting screws provided with the sensor are required for installing on the par system or can be purchased from YSI as part of the complete system These sen...

Page 5: ...nsors The EXO PAR system attaches to the EXO2 sonde via an upper and lower clamp system The EXO PAR adapter attaches to the AUX port on the top bulkhead of the EXO2 sonde For shipment and storage the...

Page 6: ...stem Frame Now that your calibration cup extender is installed stand the sonde in an upright position and slide the EXO PAR system frame over the EXO2 sonde The two clamps upper and lower are fastened...

Page 7: ...wer clamp should align with the upper edge of the top chamfer on the clear plastic section covered with the black EXO sonde label Again proper alignment is necessary so the PAR sensor arms are deploye...

Page 8: ...pplied for these cable s connectors plug these connectors when sensors are removed or if only deploying 1 of your 2 PAR sensors When not in use the plugs can be stored in the calibration cup extension...

Page 9: ...quals 2 meters Cable lengths start at 2 meters If the EXO PAR sonde is connecting to a data logger you can use the EXO flying lead cable part number 599008 xx again the xx signifies the cable length f...

Page 10: ...2 Using the Calibration Certificate supplied with your Li Cor PAR sensor you will now enter the multipliers into YSI s Kor software To do so first select Instruments and Sensors and from the list of s...

Page 11: ...ultipliers into YSI s Kor software 3 Now your PAR sensor s are ready to use You can now see PAR data begin to show up in your Kor Dashboard example shown in figure 12 Figure 12 PAR data will begin to...

Page 12: ...Enable sensors 2 Using the Calibration Certificate supplied with your Li Cor PAR sensor you will now enter the multipliers into EXO Handheld Display To do so first select Calibration and from the lis...

Page 13: ...sensors Figure 16 Enter the multipliers exactly as they are on the certificates 3 Now your PAR sensor s are ready to use You can now see PAR data begin to show up in your EXO Handheld Display example...

Page 14: ...ponents 4 2 Ordering Telephone 727 565 2201 USA Monday through Friday 8 00 AM to 5 00 ET Fax 866 778 8431 orders Email YSISystemsOrders Xyleminc com Mail YSI Inc Systems Services Division Attn Order E...

Page 15: ...This page intentionally left blank...

Page 16: ...and re used in the future is central to our work Our products and services move treat analyze monitor and return water to the environment in public utility industrial residential and commercial build...

Reviews: