Xylem McDonnell & Miller Uni-Match WF2 Series Instruction Manual Download Page 3

WATER FEEDER

INLET

VALVE

OUTLET

VALVE

UNION

UNION

STRAINER

CITY

WATER SUPPLY

CHECK

VALVE

BYPASS

VALVE

UNION

BYPASS 

CONNECT TO

RETURN HEADER

ON BOILER

3

FEED

INDICATOR

MANUAL

FEED

UNIVERSAL WATERFEEDER

U

NI-

M

ATCH

McDonnell & Miller

Chicago, IL U.S.A.

A

1. Check the product data plate (A) to make 

sure that the correct model water feeder 
(120V or 24V) was selected for installation 
with the boiler low water cut-off.

3 a. Control must be installed within eyesight 

of boiler.

b. Clearance must be provided on all sides 

to service control.

c. Unit must be installed in a horizontal pipe 

in an upright position.

d. Arrow on feeder must point in the 

direction of flow into the boiler.

e. Install isolation valves and unions on the 

inlet and outlet piping for easier trouble- 
shooting and repair/replacement.

f. Install manual fill valve and bypass line for

removal while the boiler is in service.

2. Uni-Match water feeders are shipped from the 

factory equipped for a 2 gpm feed rate. A separate 
kit with instruction sheet and field installable orifices 
for 1 gpm and 4 gpm feed rates is included. If the 
alternate feed rates are required, refer to the 
instruction sheet provided with the kit for orifice 
replacement.

1 GPM

Orifice

4 GPM

Orifice

STEP 1 - Installation

Summary of Contents for McDonnell & Miller Uni-Match WF2 Series

Page 1: ...n this document To prevent water damage check to make sure there is adequate floor drainage capacity Check all components in the system to insure that they will not leak in the event of an overfeed co...

Page 2: ...h initiates a dwell period specific to the position of the switch If the return conden sate satisfies the low water cut off LWCO during the dwell period no water will be added to the boiler Once the d...

Page 3: ...o service control c Unit must be installed in a horizontal pipe in an upright position d Arrow on feeder must point in the direction of flow into the boiler e Install isolation valves and unions on th...

Page 4: ...ical shock turn off the electrical power before making electrical connections Failure to follow this warning could cause property damage personal injury or death WARNING Boiler manufacturer schematics...

Page 5: ...24 Hydrolevel 400 10 9 WF2 U 24 Hydrolevel CG400 11 9 WF2 U 120 Hydrolevel 450 12 9 WF2 U 120 Hydrolevel CG450 13 10 WF2 U 120 Hydrolevel CGT450 14 10 WF2 U 24 Honeywell LWCO 24 volt 15 10 WF2 U 120...

Page 6: ...1 2 3 4 5 Connect wire from terminal N of water feeder to terminal 2 on LWCO Connect wire from terminal H of water feeder to terminal 1 on LWCO Connect wire from terminal W of water feeder to terminal...

Page 7: ...on LWCO Connect jumper wire connecting terminals 2 and 3 of LWCO Connect wire from terminal W of water feeder to terminal 4 on LWCO Diagram 5 WF2 U 120 67 with 120 volt burner circuit W N H BURNER 24V...

Page 8: ...inal H on water feeder and terminal 3 on low water cut off Install wire from terminal W on the water feeder to terminal 4 on the low water cut off Diagram 8 WF2 U 120 67 with millivolt burner circuit...

Page 9: ...Factory Jumper Bar BURNER Connect wire from terminal N of water feeder to terminal 2 on LWCO Connect wire from terminal H of water feeder to terminal 1 on LWCO Connect wire from terminal W of water f...

Page 10: ...CGT450 Connect wire from terminal N of water feeder to terminal 2 on LWCO Connect wire from terminal H of water feeder to terminal 1 on LWCO Connect wire from terminal W of water feeder to terminal A...

Page 11: ...tory Installed Jumper Wire UNI MATCH WATER FEEDER MODEL WF U 120 Connect wire from terminal N of water feeder to terminal N on LWCO Connect wire from terminal H of water feeder to terminal L on LWCO C...

Page 12: ...Turn the boiler s electric power on and fill it to the manufacturer s recommended normal water level by depressing the red manual feed button Z on the water feeder X Y FEED INDICATOR MANUAL FEED U N I...

Reviews: