7

MAINTENANCE

SCHEDULE:

• Blow down control as follows when boiler is in 

operation:

Steam:

– Daily if operating pressure is above 15 psi.
– Weekly if operating pressure is below 15 psi.

Hot Water:

– Quarterly

• Disassemble and inspect annually. Replace the 

low water cut-off if it is worn, corroded, or if 
components no longer operate properly.

• Inspect the float chamber and equalizing piping 

annually. Remove all sediment and debris.

• Replace head mechanism every 5 years.

More frequent replacement may be required when 
severe conditions exist such as rapid switch cycling, 
surging water levels, and use of water treatment 
chemicals.

We recommend head mechanism replacement 
when the switch(es) no longer operate properly.

If you choose to replace the switch(es), order the 
proper McDonnell & Miller replacement switch or 
switch assembly and follow the Repair Procedure 
provided.

More frequent blow-down may be necessary due to dirty
water and/or local codes.

NOTE

PROCEDURE:

1. Blow down the low water cut-off when the water 

level is at its normal level and the burner is on.

Slowly

open the blow down valve until it is fully 

open and observe the water level fall in the gauge 
glass. Close the valve after verifying that the pump
contacts have closed and the burner shuts off.
If this does not happen, immediately shut off
the boiler and correct the problem.

To prevent serious personal injury from steam
pipe blow down, connect a drain pipe to the
control opening to avoid exposure to steam
discharge.

Failure to follow this caution could cause
personal injury.

!

CAUTION

Summary of Contents for McDonnell & Miller 63 Series

Page 1: ...INSTRUCTION MANUAL MM 206H 246746...

Page 2: ...the diagram that represents your boiler c Crosses should be used at each right angle connection for inspection and cleaning d Make sure the blow down valves are full port e While the burner is operati...

Page 3: ...riser going to the radiation or to the compression tank IMPORTANT The horizontal equalizing pipe should be below the horizontal run going to the radiation If it is not an air pocket will be created a...

Page 4: ...te the installation as described in the low water cut off installation instructions 6 After all piping assembly has been completed refill the system with water turn on all electrical supply and bring...

Page 5: ...N C C N O N C C Neutral 120 V A C Supply Hot Low Water Alarm Burner Circuit Line Load SCHEMATIC OF SWITCH OPERATION Water Level Normal Burner On Alarm Off Low Water Alarm Terminals Low Water Cut Off T...

Page 6: ...k for a build up of scale or sediment between corrugations of the bellows b Cause Contacts are fused together Test Remove switch and operate manually to verify proper switch operation Solution Replace...

Page 7: ...es no longer operate properly If you choose to replace the switch es order the proper McDonnell Miller replacement switch or switch assembly and follow the Repair Procedure provided More frequent blo...

Page 8: ...ngs and other wear parts or consumables all of which are not warranted except as otherwise provided in the quotation or sales form will be free from defects in material and workmanship for a period of...

Reviews: