Xylem LOWARA Micro 10 Installation And Maintenance Manual Download Page 6

7

Weight 

Micro 10 1300 mm 130 Kg 
Micro 10 2000 mm DN 50 150 Kg 
Micro 10 2000 mm DN 65 210 Kg 
Riser 350 mm 23 Kg 
Total weight without pumps 

Volume of tank (litres) 

Micro 10 1300 mm 1200 L 
Micro 10 2,000 mm 1900 L 

Pump 

DN50 DN 65 
Refer to pump installation manual 

Fuse box

Refer to instructions supplied with this equipment.

TECHNICAL CHARACTERISTICS

Applications 

The Micro 10 is delivered completely assem-
bled and ready to be put into service. 
This pumping station is intended for pumping
raw sewage, black water with or without par-
ticles or fecal matter (bathroom and toilet fa-
cilities, WC, showers, kitchens), water
loaded with fabric, fibres or straw, slops,
rainwater or wastewater, discharged by: 

Individual dwelling         Collective dwelling 
Housing development    Campsite  Hotel 
Muncipal showers         Restaurant kitchen 
Sports complexes         Milking parlour 
Livestock pen                Abattoir 

Equipment 

The pumping station is delivered already
equipped with the following items:

1. Cover 
2. Internal gates and tubing 
3. Pump glands 
4. Inlet gasket 

Important 

Pumps, fuse box, levels controllers, chains
and shackles are delivered separately.

Temperature of pumped liquid:

35°C Max. 

Depth of excavation:

2.7 m  Max. 

External constraints 

The pumping station is designed for a water
table which may reach ground level. The
pumping station must be installed in such a
way that loads caused by vehicular traffic are
not felt less than 1.0 metre from the edge of
the pumping station. 

Tank and cover materials 

The Micro 10 tank is manufactured from ro-
tationally-molded polyethylene .

Guide bar materials 

A2 Stainless Steel 

Pipework materials 

PVC DN 50 or DN 65 discharge pipes 
Inlet to be drilled for pipe Ø 160(mm) ext.  

The pumping station is not
intended for use in an 
explosive environment or 
for inflammable liquids 

Summary of Contents for LOWARA Micro 10

Page 1: ...Installation and Maintenance Micro 10 Polyethylene packaged pumping station for lifting waste water ...

Page 2: ... may differ from the illustrations and information con tained in this manual Copying transcription translation and any other form of reproduc tion of this manual are only authorised with prior written agreement by the manufacturer This stipulation also applies to passages ex tracted from the text TABLE OF CONTENTS Safety Guarantee Technical Characteristics Transportation unloading and storage Inst...

Page 3: ...iquid must be handled in an appropriate manner in order to avoid harm to the environment The lifting equipment must be constantly kept clean and in normal working order All applicable regulations must be adhered to Because of the nature and level of performance required for the equipment noise levels may reach 70 dB This manual contains essential information on installation operation and maintenan...

Page 4: ...ertently Never work alone During any work on the interior of the pumping station beware of harmful gases and make systematic use of a safety harness and rope as well as breathing apparatus Do not under esti mate the risks of drowning Compy with local regulations for working in confined spaces Monitor the absence of toxic gases within the work area Do not under estimate health risks Meticulously en...

Page 5: ...ull information GUARANTEE Lowara undertakes to remedy any defect which may be presented by the products sold by their intermediary subject to The defect resulting from a design materials or manufacturing fault It being reported to Lowara or to the local ITT Lowaraagency within the guarantee period The product having been installed and operated in compliance with the instructions in this installati...

Page 6: ...ers Restaurant kitchen Sports complexes Milking parlour Livestock pen Abattoir Equipment The pumping station is delivered already equipped with the following items 1 Cover 2 Internal gates and tubing 3 Pump glands 4 Inlet gasket Important Pumps fuse box levels controllers chains and shackles are delivered separately Temperature of pumped liquid 35 C Max Depth of excavation 2 7 m Max External const...

Page 7: ...T 234 DP 3057 MT 238 CP 3057 MT 264 DXV 50 7 DXV 50 15 DP 3057 MT 232 DP 8022 MT 215 DP 8022 MT 211 DP 8022 MT 208 ø DISCHARGE 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 65 65 65 REFERENCE 58 60 670 58 60 210 58 60 900 58 60 240 58 60 170 58 60 190 58 60 200 58 60 680 58 60 230 58 60 220 58 60 180 58 60 370 58 60 910 58 60 400 58 60 340 58 60 350 58 60 360 58 60 390 58 60 380 58 6...

Page 8: ...nd place it in the pit Storage Outdoor storage periods must not exceed four months and the tank must be covered for example by a tarpaulin TRANSPORT UNLOADING AND STORAGE Transport 1 Ensure the tank never comes into contact with sharp edges 2 Protect the tank from impacts Loading and unloading 1 Carry out loading and unloading operations with the greatest care 2 Ensure that the pumpstation is unlo...

Page 9: ...allation General informa tion and instructions in accordance with EN 976 2 1997 Warning Never install pumps before covering the tank with earth Installation in the ground The pumpstation is designed to resist stresses linked to the presence of a water table flush with ground level The pumping station must not be installed in soil composed of peat When the pumpsta tion is installed in soil which is...

Page 10: ...livery input drilling area is the assembly location for the two pump glands Pass the cables through these pump glands Ensure that sufficient length of cable is left for any subsequent work on the pump Note Separate the earth cable from the live cable on the pump Above the hooks for the regulators in the flat area is the assembly area for the pump glands for the level regulators Pass the cables thr...

Page 11: ...is clamped over the tank Ensure a minimum of two full turns in order to achieve perfect tightness Riser The riser is screwed on the upper part of the tank in the place normally occupied by the cover The cover is then screwed to the upper part of the riser Up to two may be fitted Fig 8 Figure 5 Angular position of hook on riser Ground rod and earth strap optional Hook the earth strap between the gu...

Page 12: ...ver as indicated in the diagram below Next thread the nut 2 over the barrel inside of the cover Then place the locking lug 3 over the square form of the barrel and insert the screw 4 to keep the lug in place Using the spanner 5 release the locking device so that the lug 3 does not project outside the cover Screw the cover over your lift station then lock the cover with the spanner Remove the spann...

Page 13: ... electrical supply cable is discon nected from mains power Check the supply voltage on the pump s data plate Check that the specifications on the motor s dataplate match the mains voltage and frequency Carefully read the installation and mainte nance manual supplied with the pump to gether with that on the electrical control box Pass the cables motor cable level regulator cable and equipotential b...

Page 14: ...15 GENERAL ARRANGEMENT 40 3 2 5 3 4 27 28 1 8 14 16 15 26 23 24 25 22 24 21 19 13 20 11 9 7 ...

Page 15: ... 4x850 length galvanised steel 14 2 Guide bar support stainless steel 15 1 Cross beam guide bar pipework galvanised steel 16 3 Clip for dn50 return tube pvc 17 1 Support for regulator 4 pts Stainless steel 18 1 Pump gland to be advised 19 1 Pipework dn50 total length Pvc 20 2 Male 2 female 63 endpiece Pvc 21 4 Female 45 elbow joint dn63 Pvc 22 2 Loose flange dn50 Pvc 23 2 Fixed flange dn50 pvc 24 ...

Page 16: ...17 DECLARATION OF CONFORMITY ...

Page 17: ...loyees worldwide The name Xylem is derived from classical Greek and is the tissue that transports water in plants highlighting the engineering efficiency of our water centric business by linking it with the best water transportation of all that which occurs in nature For more information please visit us at www xyleminc com Lowara UK Limited Millwey Rise Industrial Estate Axminster Devon EX13 5HU U...

Reviews: