Use applicable support grips.
2. Adjust the height of the level sensors according to the installation drawing.
NOTICE:
It is essential to ensure the proper functioning of level regulators in the unit.
4.2.8 Install the control panel
1. Run the cables through the cable entry to the start and control panel.
The pump motor cable must be long enough to enable removal of the pump from the unit.
2. Connect the leads.
See the wiring diagram supplied with the control panel.
3. Install and connect the main supply cable to the control panel.
See the wiring diagram supplied with the control panel.
4.2.9 Equipotential bonding
The unit is prepared for protective equipotential bonding.
• Connect the upper guide bar holder and the protective grid or grids, if mounted, with a
separate earth wire.
• Connect the earth wire from the cabinet to the upper guide bar holder.
WS007154A
Figure 9: Upper guide bar holder with earth connection
4.2.10 Backfill
Compaction of the backfill must be thoroughly done to make sure that the surrounding
material provides support to the structure of the unit.
NOTICE:
Do not allow soil or gravel to get inside the unit.
Counteractive loads are achieved by dead load of the concrete footing and vertical earth
pressure on the concrete footing.
1. Check that the following requirements are fulfilled:
– The unit must be level after backfilling.
– Backfilling must be correctly made around inlet pipes, outlet pipes, and the unit
bottom.
– The pipe work and the electrical connections must be protected and supported during
backfilling so that no load is applied to them by the compaction operation.
– The backfill must not contain any contamination, such as snow or ice of significant
importance.