14 

15GDS/20GDS Installation, Operation and Maintenance Manual

Under no circumstances may the starter equipment be installed in the sump.

NOTE: For safety reasons, the earth conductor should be approximately 2.0” (50 mm) 

longer than the phase conductors. If the motor cable is jerked loose by mistake, the earth 
conductor should be the last conductor to come loose from its terminal. This applies to both 
ends of the cable.

Thermal contacts are incorporated in the stator. The thermal contacts can be connected to 
maximum 250 V, breaking current maximum 4 A. Bell & Gossett recommends that they be 
connected to 24 V over separate fuses to protect the other automatic equipment.

Make sure that the pump is correctly earthed (grounded).

When using a variable-frequency-drive (VFD) special rules have to be followed to avoid 
clogging and over-heating. Contact your VFD supplier and ask for electrical limitations.

Remember that the starting current in direct online starting can be up to six times higher 
than the rated current. Make sure that the fuses or circuit breakers are of the proper rating.

The Parts List gives rated current. Fuse rating and cable shall be selected in accordance with 
local rules and regulations. Note that with long cables, the voltage drop in the cable must be 
taken into consideration, since the motor’s rated voltage is the voltage that is measured at 
the terminal board in the pump.

The overload protection (motor protection breaker) for direct online starting shall be set to 
the motor rated current as given on the data plate.

Check the phase sequence in the mains with the phase sequence indicator.

If intermittent operation is prescribed (see Data Plate), the pump shall be provided with 
control equipment that provides such operation.

Single Phase Operation

The single phase pumps must be equipped with a starter which has start and run capacitors.

A special designed starter is required for the operation of single phase pumps. The 
connection of the motor cable to the starter is shown in the wiring diagram.

NOTE: It is not possible to change the direction of rotation of a single phase pump by 

changing the cable conductors on the starter. Please contact your nearest Bell & Gossett 
representative.

Monitoring Equipment

The FLS sensor consists of a small float switch for sensing water in the stator housing. Its 
design makes it suitable for pumps in vertical installations. The FLS sensor is installed in the 
bottom of the stator housing.

The MiniCas II is a monitoring relay to which FLS is connected.

Check:

• signals and tripping function.
• that relays, lamps, fuses and connections are intact.

Replace defective equipment.

Electrical Connections (continued)

Summary of Contents for Bell & Gossett 15GDS

Page 1: ...Models 15GDS 20GDS INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS INSTRUCTION MANUAL IM214R02...

Page 2: ...2 15GDS 20GDS Installation Operation and Maintenance Manual...

Page 3: ...Storage 17 Operation 18 Care and Maintenance 19 Oil Change 20 Service Log 22 Owners Information Complete this information for your records Model number and serial number may be found on the tag mounte...

Page 4: ...ction procedures are the same for all the pumps However where there are differences they are called out separately within the manual The design materials and workmanship incorporated in the constructi...

Page 5: ...ed will result in death or serious injury Warning Indicates a hazardous situation which if not avoided could result in death or serious injury Caution Indicates a hazardous situation which if not avoi...

Page 6: ...s on the performance curve Make sure that you understand the noise level requirements in the environment where the pump is installed Failure to do so may result in hearing loss or violation of local l...

Page 7: ...low all system and pump components to cool before you handle them Make sure that you have a clear path of retreat Make sure that the product cannot roll or fall over and injure people or damage proper...

Page 8: ...e motors comply with UL CSA and NEMA standards Product warranty Personnel requirements All work on the product must be carried out by certified electricians and Bell Gossett authorized service centers...

Page 9: ...umber Approval Plate This approval plate applies to an explosion proof submersible Bell Gossett pump The plate is used together with the general data plate on the pump FM Factory Mutual Class I Divisi...

Page 10: ...H limits below The pump is available for permanent installation in a sump or portable installation For further information on applications contact your nearest Bell Gossett wastewater representative S...

Page 11: ...integral part Shaft material stainless steel 4 Bearings The support bearing of the rotor consists of a single row ball bearing The main bearing of the rotor consists of a two row angular contact ball...

Page 12: ...rated voltage Without overheating the motor 10 variation from the rated voltage can be accepted provided that the motor does not run continuously at full load The motor is designed to operate at a vo...

Page 13: ...Check that the lifting handle and chain are in good condition For automatic operation of the pump level control it is recommended that the level regulators be used at low voltage The data sheet delive...

Page 14: ...Use safety helmet safety goggles and protective shoes 10 All personnel who work with sewage systems must be vaccinated against diseases to which they may be exposed 11 A first aid kit must be close a...

Page 15: ...imming pools special safety regulations apply NOTE FOR EX VERSION Electrical connections on the explosion proof motor must be made by authorized personnel Bell Gossett disclaims all responsibility for...

Page 16: ...the voltage drop in the cable must be taken into consideration since the motor s rated voltage is the voltage that is measured at the terminal board in the pump The overload protection motor protecti...

Page 17: ...ge T1 blue T2 Cable Chart Single Phase Connection Conductors Starter For Canada USA SUBCAB xAWG 4 red 1 black 2 white 3 yellow green ground SUBCAB xAWG 7 red 1 black 2 white 3 yellow GC yellow green g...

Page 18: ...Blue YE Yellow U1 U5 RD U2 U6 GN V1 V5 BN V2 V6 BU W1 W5 YE W2 W6 BK T1 T2 WH YE 2 L2 BK 2 BK BK BK 3 L3 BK 3 GY WH GY L1 BK 4 L2 BK 5 L3 BK 6 GN YE GN YE GN YE Screen PE from cores SUBCAB AWG Ground...

Page 19: ...e pump shall be run for a short period after being raised in order to discharge all remaining water A frozen impeller can be thawed by allowing the pump to stand immersed in the liquid for a short per...

Page 20: ...check that the impeller can be rotated freely Check that the monitoring equipment if any works Check the direction of rotation The impeller shall rotate clockwise as viewed from above When started the...

Page 21: ...les and rubber gloves Rinse the components in water after dismantling The oil housing may be under pressure Hold a rag over the oil screw oil plug to prevent splatter Proceed as follows if hazardous c...

Page 22: ...must be done through the oil out hole 2 Turn the pump Unscrew the oil in oil hole screw plug In order to drain out all oil the pump must be raised upright for a short while during drainage 3 Replace...

Page 23: ...15GDS 20GDS Installation Operation and Maintenance Manual 21 Figure 2 Figure 3 Oil Change continued...

Page 24: ...22 15GDS 20GDS Installation Operation and Maintenance Manual XII Service Log Most Recent Pump No Hours of Remarks Sign Service Date Operation Service Log...

Page 25: ...15GDS 20GDS Installation Operation and Maintenance Manual 23 Notes...

Page 26: ...ology company We re a global team unified in a common purpose creating innovative solutions to meet our world s water needs Developing new technologies that will improve the way water is used conserve...

Reviews: