32
Version 1 – GBR (25/10/2022)
D-502-0287
5.
Commissioning
5.1.
Prior to first startup, check:
-
that all the installation work has been duly completed as indicated in Section 3,
-
whether the power supply cable of the unit is properly connected to the mains,
-
whether the connected electrical accessories are correctly wired,
-
whether the condensation trap is watered, and the condensate outlet is connected to the sewer system,
-
whether the unit contains clean filters.
5.2.
Activation – Basic Unit Commissioning
-
The basic unit commissioning is used to verify the functionality of the unit after completion of the
installation.
Further options and details on unit settings are provided in the following Sections.
1.
Switch the main switch from position 0 (OFF) to position 1 (ON) and wait until:
o
All the LEDs on the controller flash 3 times.
o
All the status LEDs flash.
o
The LEDs stop flashing - controller is loaded - you can continue
The controller is loaded only when power is connected to the unit.
2.
Hold down the ON/OFF button for approx. 3 s until the blue status LED above it lights up. Unit is
switched on
3.
The unit is factory set to 4th ventilation level, which is used to verify the basic functionality of the
unit.
4.
Check the unit operation - for example: by hearing,
5.
The unit is operational.
6.
Now, you can perform further unit settings according to your requirements.
If you have already connected the AQS air quality sensors when you first start the unit, the automatic
regime LED will flash - sensor calibration is in progress (approx. 5 s). The fans can take up to 20 s to start up
from idle.
Fig. 39
Controller loading - can take up to 25 s.