32
Version 1 – GBR (11/05/2022)
D-502-0260
5.2.
Water version - BR1-xx-ACV1S-xxx
Page 1: ...1 Version 1 GBR 11 05 2022 D 502 0260 OPERATING AND INSTALLATION INSTRUCTIONS FOR THE COMMERCIAL BREEZE AIR CURTAIN...
Page 2: ...2 1 8 Regulation 8 2 1 9 Main switch 8 2 1 10 M6x20 bolts 8 2 2 Main dimensions and minimum working space requirements of the Breeze air curtain 9 2 3 Technical parameters of Breeze air curtains 9 2...
Page 3: ...7 1 Preparation of curtains before chaining 22 3 7 2 Installation of chained curtains 23 3 8 Water type heat exchanger connection 23 3 8 1 Connection of the curtain to the building hot water distribu...
Page 4: ...2 10 Factory regulation setting 30 4 3 Technical parameters of regulation accessories external elements 30 5 Wiring diagram of the Breeze curtain 31 5 1 Electric version BR1 xx ACE1S xxx 31 5 2 Water...
Page 5: ...installation site keep it for future use It is forbidden to interfere in any way with the curtain internal connection other than as specified in this manual Due to the continuous development of our pr...
Page 6: ...e for damage caused by improper use of the curtain The user bears the risk 1 4 Transport Delivery Control and Storage 1 4 1 Transport During transport keep the product in the position indicated by the...
Page 7: ...its power depending on the heat removal from its surface The surface temperature of the body is always the same and is independent of the temperature of the blowing air This ensures approximately the...
Page 8: ...n is solved in the chapter according to the selected installation position 2 1 8 Regulation The main power cable connection point and control peripherals Description of the regulation and elements con...
Page 9: ...BR 11 05 2022 D 502 0260 2 2 Main dimensions and minimum working space requirements of the Breeze air curtain 2 3 Technical parameters of Breeze air curtains 2 3 1 BREEZE 15 2 3 2 BREEZE 20 Fig 4 Tab...
Page 10: ...EZE 25 EC Declaration of Conformity the current and full version of the EC Declaration of Conformity can be found on our website www xvent cz in the Breeze product documents 2 4 Technical data of wate...
Page 11: ...trical safety before installation of the curtain before starting any installation work the power supply to the prepared wiring must be switched off for commissioning of the unit During the installatio...
Page 12: ...heated space and at the same time the indoor space is completely separated shielded from the outdoor space 3 1 5 Minimum safety distances from combustible substances the minimum safety distance from...
Page 13: ...connection to the main electrical supply and the piping depending on the version chosen within the layout possibilities where the curtain is installed 3 2 1 1 Top curtain connection from the ceiling...
Page 14: ...ation at the bottom at the floor The base mounting procedure is the same as for the top connection see Chapter 3 2 1 1 3 2 2 Placing the curtain in the working position 3 2 2 1 Top curtain connection...
Page 15: ...the main switch is located on the shroud Connect the power supply and the controls of the curtain door contact actuator on the water version according to Chapter 3 9 Route the main supply line throug...
Page 16: ...eight of 4 m By chaining connecting the curtains to each other it is possible to create an optimum assembly for the correct shielding of the required opening based on its dimensions The correct height...
Page 17: ...tain so that of the connecting piece protrudes above the anchored curtain Use 4x self tapping screws 3 5x9 5 included in the connecting piece package to mount the connecting piece Lift the curtain to...
Page 18: ...the assembly o Always install the BREEZE HINGE set included in the curtain package to the top curtain in all 4 anchor points Choose the appropriate method and fasteners for anchoring the curtain accor...
Page 19: ...tain exhaust must always be tangent to the shielded opening For further explanation see Chapter 3 7 3 6 2 Auxiliary anchoring structures Prepare suitable auxiliary anchoring structures brackets thread...
Page 20: ...ot included in the delivery of BREEZE HINGE accessories Lift the partially unpacked curtain according to 3 5 1 with suitable handling equipment e g forklift truck to the prepared installation location...
Page 21: ...only after they are anchored to the wall or ceiling By chaining connecting the curtains next to each other it is possible to create an optimum set for the correct shielding of the required opening ba...
Page 22: ...n so that of the connecting piece protrudes towards the next curtain to be chained Use 4x self tapping screws 3 5x9 5 included in the connecting piece package to mount the connecting piece CURTAIN PRE...
Page 23: ...of the water heat exchanger to tighten the pipe to be connected to the curtain This prevents the exchanger outlets from twisting which can result in irreversible damage to the water exchanger 3 8 3 Ex...
Page 24: ...Power connection and curtain control Before mounting in the working position consider the possibility of connection to power and controls including the possibility of adjusting the curtain functional...
Page 25: ...the size of the shielded opening see 4 2 8 1 adjustment of the shielding performance according to the size of the shielded opening Terminal marked as L vent connects the fans to the selected shieldin...
Page 26: ...ains connection Only qualified persons with valid authorization and knowledge of the relevant standards and directives may carry out the wiring and electrical installation of the curtains Before start...
Page 27: ...gulation enables o setting the shielding level see 4 2 8 1 according to the size of the shielded opening taking into account local conditions Factory setting for the shielding level 1 designed for a c...
Page 28: ...and receiver synchronization If you have not managed to pair within 1 min the LED on the receiver is lit Repeat the procedure 4 2 5 Curtain switch off delay device It is used to set the delay of the...
Page 29: ...or designer 4 2 8 2 Setting of delayed curtain switching off Setting of delayed curtain switching off is used to optimise the operation of the curtain the noise comfort of persons in the shielded room...
Page 30: ...ture is higher than the thermostat setpoint o the door is open the fans are running at the required shielding level Chapter 4 2 8 1 the door opening is shielded the valve is closed electric heaters ar...
Page 31: ...31 Version 1 GBR 11 05 2022 D 502 0260 5 Wiring diagram of the Breeze curtain 5 1 Electric version BR1 xx ACE1S xxx...
Page 32: ...32 Version 1 GBR 11 05 2022 D 502 0260 5 2 Water version BR1 xx ACV1S xxx...
Page 33: ...33 Version 1 GBR 11 05 2022 D 502 0260 5 3 Unheated version BR1 xx ACS0S xxx...
Page 34: ...34 Version 1 GBR 11 05 2022 D 502 0260 5 4 Example of chained curtains wiring The door contact chaining is shown by the bold dashed line...
Page 35: ...Otherwise there is a risk of burns and injuries from rotating parts 7 1 Regular maintenance Regular inspection of the curtain especially the water exchanger is recommended every 500 hours of curtain o...
Page 36: ...AP IT FROM THE SCREW DETAIL OF THE SNAPPED COVER THERE IS A SLOT ON THE COVER 3 VACUUM ANY DUST FROM THE COMPONENTS OF THE CURTAIN WATER EXCHANGER ELECTRIC EXCHANGER FAN CLEAN OTHER AVAILABLE FLAT SUR...
Page 37: ...UM CLEANER FROM BOTH SIDES BE CAREFUL NOT TO DAMAGE THE COVER 5 AFTER CLEANING MOUNT THE INTAKE COVERS BACK FIRST HOOK ON ONE SIDE TO THE SCREWS AND THEN BEND THE COVER TO HOOK IT ON THE OTHER SIDE TH...
Page 38: ...d down Any service work on the electric system must be carried out by a qualified person Make the electrical connection exactly according to the supplied electrical documentation on request 8 1 Troubl...
Page 39: ...the batteries must be removed first Flat batteries can be disposed of in collection bins provided by specialist electronics shops or handed over to the relevant organization dealing with the collectio...
Page 40: ...an unjustified complaint all the costs relating to such complaint shall be borne by the complainant 11 In Conclusion If you have any questions about this product do not hesitate to contact us Contact...