background image

Xtreme Power Conversion Corporation

NXRT-EBP User’s Manual

Page 5

External Battery Packs

EBP’s “daisy chain” to UPS or other EBP

Extended Battery Pack Installation

CAUTION:

 Extended Battery Pack (EBP) Installation should be performed by qualified service personnel.

1. 

Verify that the DC circuit breaker on the rear panel of the EBP is in the OFF position.

2. 

Turn the UPS OFF and disconnect the UPS Input Cord from the AC wall outlet.

3. 

Remove the EBP connector cover from the UPS rear panel. 

4. 

Connect the external DC battery cable from the EBP to the appropriate connector on the UPS.

5. 

Secure the DC battery cable to both the rear of the UPS and the rear of the EBP by using M3 x 8 screws 

provided (2 each per connector end).

6. 

Repeat the above procedure for testing and securing each additional EBP required.

7. 

Move the DC circuit breaker on the rear of each EBP to the ON position. At this point the UPS will need to 

be started.

NOTE:

 If the EBP is going to be out of service or stored for six months or longer, the batteries must be re-

charged for at least 36 hours every six months.

Summary of Contents for NXRT-EBP

Page 1: ...NXRT EBP External Battery Packs User Installation Manual www xpcc com 2015 Xtreme Power Conversion Corporation All rights reserved Rev 5 20 15 ...

Page 2: ...than two EBP s a CBP must be added See Appendix B for additional information CAUTION It is very critical to connect the correct voltage EBP with the UPS intended EBP1 is for NXRT 1000 EBP2 is for NXRT 1500 EBP3 is for NXRT 2000 3000 CONNECTING THE INCORRECT BATTERY PACK TO THE UPS MAY RESULT IN DAMAGE TO THE UPS AND OR BATTERY PACK WILL VOID THE WARRANTY All EBP s have a different DC voltage confi...

Page 3: ...Xtreme Power Conversion Corporation NXRT EBP User s Manual Page 3 External Battery Packs Extended Battery Pack Configuration EBP1 for NXRT 1000 EBP2 for NXRT 1500 EBP3 for NXRT 2000 3000 ...

Page 4: ...ing EBP s test each EBP to assure proper operation Extended Battery Pack Operation The NXRT UPS System can be connected with up to two EBPs to increase the runtime when connected to the UPS supporting the load 1 The DC Circuit Breaker on the rear of the EBP connects and disconnects the DC bus voltage from the EBP to the UPS The DC Circuit Breaker will also trip to the OFF position in the event of ...

Page 5: ... the EBP connector cover from the UPS rear panel 4 Connect the external DC battery cable from the EBP to the appropriate connector on the UPS 5 Secure the DC battery cable to both the rear of the UPS and the rear of the EBP by using M3 x 8 screws provided 2 each per connector end 6 Repeat the above procedure for testing and securing each additional EBP required 7 Move the DC circuit breaker on the...

Reviews: