9
Preparation
Initial Power On Test
To ensure the camera works well after installation, please power on it for an initial test with the
following steps:
1. Connect the camera with correct power supply;
2. Connect control cable, video cable;
3. Power on the camera;
The camera will run a calibration procedure on power up and show the following messages on
screen.
DOME ID
:
001
PROTOCOL
:
PELCO-D/P
BAUD
:
9600
SOFTWARE VER
:
1.3
Fig.2: On Screen Messages at Power Up
On the control device, set the protocol Pelco and the camera ID as per the above messages. The
PTZ camera can auto detect the protocols and baud rate of the controller and change its own
setting accordingly.
Installation Place
Make sure the installation place has enough space, support strength to install the whole PTZ
camera and its accessories.