31
4.7 Cargo loading method and carrier curve
When the goods are putting on the loading board, adjust the
position (Y axes) of the goods to keep balance. Keep the goods as
close to the vertical beam as possible. Tie the goods to the vertical
beam with a strap. Make sure the center of gravity of the goods is
within the width of the loading board (X axes). The shapes difference
of the goods results in a change in the horizontal distance between
the center of gravity for cargo and the vertical beam(B/2+L1), the
weight of the goods should be adjusted to avoid machine damage and
safety hazards caused by improper loading.
The relationship between the distance from the center of gravity for
cargo to the vertical beam(B/2+L1) and the weight of the goods refer
to the chart below.
Summary of Contents for ZW4250
Page 1: ...xstoclimbers com POWERED STAIR CLIMBER OPERATION MANUAL...
Page 3: ...Signature of the manufacturer XSTO CO LTD...
Page 4: ......
Page 7: ......
Page 8: ......
Page 16: ...8...
Page 25: ...17 2 Insert loading board under the cargo and secure with safety strap...
Page 40: ...32...
Page 53: ......