background image

 

https://www.XPOtool.com 

 

Item 63021

 

Page 13

 

The Tool Experts

 

 

  

 

05 2022-1

 

 

Regulations for waste disposal

 

 
 

The Waste Electrical and Electronic Equipment Directive (WEEE Directive, 2012/19/EU) of the EU was 
implemented in the German law related to electrical and electronic equipment and appliances.

 

 

All WilTec electric devices that fall under the WEEE directive are labelled with the symbol of a crossed-
out wheeled rubbish bin. This symbol indicates that this electric device must not be disposed of with the 
domestic waste.

 

 

WilTec  Technik  GmbH  is  registered  with  the  German  registration  authority  EAR  (Stiftung  Elektro-
Altgeräte Register) under the WEEE-registration number DE45283704.

 

 

Disposal of used electrical and electronic devices (in-
tended for use in the countries of the European Union 
and  other  European  countries  with  a  separate  waste 
collection system for these devices).

 

The symbol on the packaging or the product itself indi-
cates that this product must not be treated as normal 
domestic waste but must be disposed of at a recycling 
collection station for electrical and electronic waste.

 

By disposing of this product correctly, you contribute to 
the protection of the environment and the health of your 
fellow people. Inappropriate disposal threatens the en-
vironment and health.

 

 

Material recycling helps to reduce the consumption of raw materials.

 

 

Additional information about the recycling of this product can be provided by your local commune, the 
municipal waste disposal facilities, or the store where you purchased the product.

 

 
 
 
 

Address:

 

WilTec Wildanger Technik GmbH

 

Königsbenden 12 / 28

 

52249 Eschweiler Germany

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Important Note:

 

 

Reproduction and any commercial use (of parts) of this operating manual, requires a written permission 
of WilTec Wildanger Technik GmbH.

 

Summary of Contents for 63021

Page 1: ...vary depending on model Please read and follow the operating instructions and safety information prior to initial operation Technical changes reserved Illustrations functional steps and technical data...

Page 2: ...f you have found an error or wish to suggest an improvement we look forward to hearing from you Send us an e mail to service wiltec info or use our contact form https www wiltec de contacts The most r...

Page 3: ...cylinder must be set up in accordance with the applicable regulations The ventilation slots in the gas cylinder housing must not be blocked The device must not be moved while in operation Gas lines a...

Page 4: ...d the pilot flame burner must be checked for leaks or damaged areas The leak test should be carried out with a soap solution Never use an open flame to look for leaks Do not put the heater into operat...

Page 5: ...pressure reducing valve and hose must correspond to the local regulations The installation must also comply with local requirements if there are none it must meet the standard requirements for the st...

Page 6: ...at the lower end of the flame protection grille must be pushed to the side to the left or right of the control unit If the pilot flame does not ignite or goes out again repeat step 3 4 After igniting...

Page 7: ...or stainless steel Gas hose connections with metal hose clamps screw caps for Germany Heat radiation from reflector Technical specifications Gas to be used only propane butane or their mixture Max po...

Page 8: ...Injector size I3 28 30 37 Butane 28 30 13 G30 945 g h G31 929 g h 1 90 main burner 0 18 pilot burner Propane 37 I3B P 30 Butane propane or their mixtures 30 I3B P 50 50 1 70 main burner 0 18 pilot bur...

Page 9: ...m adjustable spanner 2 23 cm slip joint pliers Philips screwdriver with medium blade Spray bottle of soap solution for leak test Figures Name Qty A Reflector panel 3 B Reflector plate 1 FF Reflector s...

Page 10: ...ector spacer 3 GG HH II JJ KK LL 8 washer 9 6 washer 9 M6 10 screw 9 Cap nut 9 Wing nut 3 Wrench 1 Assembly Step 1 1 Put the 3 post brackets 1 on each position on the stand 2 as shown 2 Use 3 M8 16 bo...

Page 11: ...urner are assembled according to instructions and all bolts and nuts are tightened 2 Put 6 large flat washers on the 3 reflector spac ers 1 Step 6 Fasten the reflector 2 with 3 large flat washers and...

Page 12: ...ontaminated areas ose connections Re tighten connections Defective heat sensor Replace heat sensor eaking gas line Check connections Insufficient fuel pressure Container almost empty refill Burner doe...

Page 13: ...on and other European countries with a separate waste collection system for these devices The symbol on the packaging or the product itself indi cates that this product must not be treated as normal d...

Reviews: