Section 5 – Set up
5 Set up
After completing the installation, system setup must be carried out by a qualified technician in order to check
the correct functionality.
5.1 Requirements for the building
Set up must only be carried out when the building and rooms are ready for occupation.
Ensure that the rooms are free of dust, eg. construction material.
NOTE!
For setting up, the unit and all air inlets and outlets must be freely accessible.
5.2 Requirements for the ventilation system
For set up, the installation of all components of the ventilation system must be completed:
5.3 Requirements for the technician
For setup of the ventilation system, the qualified and trained technician will need the following measuring
equipment:
Multimeter
Temperature measuring instrument
Vane anemometer with measuring funnel
Differential pressure gauge
NOTE!
Setup should be carried out by a qualified technician. Improper setting up of the ventilation
system can lead to poor and inefficient ventilation and can cause high noise levels and draughty
air conditions!
5.4 Set up procedure
The set up of the ventilation system is carried out on the basis of the following general procedure:
1.
Visual inspection of the installed system
Ventilation unit, condensate discharge line, filter
Controllers, sensors, accessories
Air-duct system, thermal insulation
Special features (e.g. with open flue fire installation)
2.
Start-up
Switch on the power supply
Functional check of unit and accessories
3.
Adjustments.
IMPORTANT :
Follow instructions in 6.3.1 to set Supply and Extract Flow rates.
Volume flow rates, adjusting unit and valves
Programming the control
4.
Instructions
Instructing the user / operator on control and maintenance procedures
During initial measuring of the ventilation system, all interior doors and all windows must be kept shut.
All settings required for start-up are made in the Installer menu (see “Control”).
27