![Xo XOU24BCGOA Manual Download Page 14](http://html1.mh-extra.com/html/xo/xou24bcgoa/xou24bcgoa_manual_3562870014.webp)
14
1. Fully open the door and pull the gasket
out of the gasket channel.
starting at one corner
2. After removing the gasket lay it out on a flat surface to retain its shape.
3. Using clamps to hold it securely in place, position the overlay panel against the door.
4. Using the frame as a guide, drill six (6) pilot holes i1/8” (3mm) in dia. nto the finish panel no
more than 1/2” (12mm) deep taking care not to drill through the panel.
5. Using the ST4-30 self-tapping screws provided, fasten the panel to the door frame.
6. Beginning at one corner, re-install the rubber door gasket into the gasket channel.
BEFORE BEGINNING: Attach any handle hardware before mounting the panel to the door frame.
Mounting screw holes are located
in the gasket channel behind the gasket.
SCREW
HOLE
LOCATIONS
S
6
IMPORTANT NOTE: The back of the panel must be finished to prevent warping and cracking.