3
Fit the Pelmet to the Wall
Determine the track height required ensuring there is approximately 5mm between the floor and the bottom edge of the
door and that the door covers the height of the aperture.
Ensure that the Pelmet is level and pre-drill through the track holes and Pelmet into the wall.
Secure the Track and Pelmet to the wall using suitable fixings.
Hang the Door onto the Track
Place the Hangar onto the Track.
Slot the Hanger bolts onto the Hanger.
Adjust the Top Bolt until the bottom of the door is approximately 5mm from the floor.
Ensure that the door hangs level and can slide along the track smoothly – ensure that the door does not slide off the
track.
Tighten the lower bolt to secure the door to the hangar.
Fit the Floor Guide to the Floor
Assemble the Floor Guide
Fix the Floor Guide to the Aperture reveal where it intersects with the floor
Adjust the Floor Guide to the door thickness with approximately 2mm clearance and tighten
Fit the Door Stops
Fit the 1st Door Stop approximately 1/3 of the door height from the top of the door, with the door located in the open
position.
Fit the 2nd Door Stop at the same height, with the door located in the closed position.